Scheduling of testing tasks and resource planning in new product development using stochastic programming
نویسندگان
چکیده
Testing is a crucial step in new product development in many industrial sectors, from microelectronics to the automotive industry. In the pharmaceutical sector, specifically, candidate drugs have to undergo clinical trials, a process that takes 2–4 years and costs hundreds of millions of dollars. In this paper we are concerned with the scheduling of clinical trials and the planning of the resources necessary to carry these trials out. We present a stochastic programming (SP) framework that addresses the two problems simultaneously. To address large problems we develop a number of results andmethods. First, we exploit the structure of the problem to reduce the number of pairs of scenarios forwhich non-anticipativity has to be enforced, and the number of binary variables. Second, we develop a finite-horizon approximation that tochastic programming ixed-integer programming allows us to formulate problems using fewer stages without compromising the quality of the solution. Third, we take advantage of the sequential nature of the testing process to develop a smaller but tighter mixed-integer programming (MIP) formulation; we show that a relaxation of this formulation can be used to obtain feasible and most often optimal solutions over the stages of interest. Finally, we develop a rolling-horizon-based approach, where the decisions of the relaxed problem are used over few early periods determining how and when uncertainty will be realized, and a new problem is formulated and d in t
منابع مشابه
A multi-product vehicle routing scheduling model with time window constraints for cross docking system under uncertainty: A fuzzy possibilistic-stochastic programming
Mathematical modeling of supply chain operations has proven to be one of the most complex tasks in the field of operations management and operations research. Despite the abundance of several modeling proposals in the literature; for vast majority of them, no effective universal application is conceived. This issue renders the proposed mathematical models inapplicable due largely to the fact th...
متن کاملA stochastic model for operating room planning under uncertainty and equipment capacity constraints
In the present economic context, the operating theater is considered as a critical activity in health care management. This paper describes a model for operating room (OR) planning under constraint of a unique equipment. At first level we schedule elective surgeries under the uncertainty of using a unique equipment. At the second level we consider emergency surgeries, and at the third le...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملA Stochastic Programming Approach for a Multi-Site Supply Chain Planning in Textile and Apparel Industry under Demand Uncertainty
In this study, a new stochastic model is proposed to deal with a multi-product, multi-period, multi-stage, multi-site production and transportation supply chain planning problem under demand uncertainty. A two-stage stochastic linear programming approach is used to maximize the expected profit. Decisions such as the production amount, the inventory level of finished and semi-finished product, t...
متن کاملResource-Constrained Scheduling of Tests in New Product Development
The problem of resource-constrained scheduling of testing tasks for new product development is addressed. The problem is important because, in some industries like pharmaceutical and agrochemicals, a new product is required to pass all the tests by federal laws. If a product fails any of the tests, then all the remaining work on that product is halted and the investment in the previous tests is...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Computers & Chemical Engineering
دوره 33 شماره
صفحات -
تاریخ انتشار 2009