Integrated Modeling Environment Project

نویسنده

  • Marek Makowski
چکیده

The strategic goal of the Integrated Modeling Environment (IME) Project is to build capacity to meet IIASA’s growing needs for integrated modeling support where commonly known methodology and/or general-purpose modeling tools are inadequate. The long-term aim is to strengthen IIASA’s in-house capabilities and competitive advantage in modeling complex problems. The strategic goal is decomposed into three objectives: (1) Integrate and extend modeling methods and tools developed to address individual demands into an advanced Web-based modeling environment adapted specifically to the needs of IIASA’s programs. (2) Develop methods and tools for policy analyses to cope with inherent endogenous uncertainties and risks with potential catastrophic consequences, proper representation of abrupt changes, spatial and temporal distributional heterogeneities, vulnerabilities, and robust solutions. (3) Develop methodology and tools for integrated model analysis aimed at combining the capabilities of different methods (such as various types of simulation, optimization, multicriteria model analysis, sensitivity analysis) with data mining technology. The relevance of the IME activities to IIASA objectives and mission will be achieved by a continuation of the long-term collaboration with (1) IIASA applied programs that need new modeling methods, and (2) networks of leading researchers in the pertinent fields of science. Introduction Methodological activities at IIASA fall into two categories. First, each IIASA program develops and exploits disciplinary methodology pertinent to its research; often such methodology includes modeling methods and tools: either standard (general-purpose) or discipline-specific. Second, many of IIASA programs develop models for which established modeling methods or standard modeling tools are not adequate. IME addresses a part of (defined implicitly by the characteristics of modeling activities presented in points 1 to 6 below) the needs for methodological research and support of the second category. The relevance of advanced modeling methodology to policy issues is justified by the characteristics of the models developed for analyzing policy-related problems, and thus support the corresponding decision-making processes. Such models have growing complexity and size, and are often developed by integrating models and/or data developed by different teams; they also need to properly treat uncertainty and risks, as well as spatial and temporal distributions. Moreover, the modeling processes supporting policy making have to meet the strong requirements of: credibility, transparency, replicability of results, integrated model analysis, controllability (modification of model specification and data, and various views on, and 1 In collaboration with Yuri Ermoliev, the Institute Scholar, whose research will become a key part of the IME project. 2 Methodology is understood (following Webster’s dictionary) as the system of principles, procedures, and practices applied to a particular branch of knowledge. 3 Other areas of methodology are addressed in the research plan of IIASA’s Dynamic Systems Program.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Implementation of Integrated Project Delivery and Building Information Modeling on a Small Commercial Project

Integrated Project Delivery (IPD) seeks to improve project outcomes through a collaborative approach of aligning the incentives and goals of the project team through shared risk and reward, early involvement of all parties, and a multi-party agreement. The coupling of Building Information Modeling (BIM) with IPD enables a level of collaboration that not only improves efficiency and reduces erro...

متن کامل

Modeling of Software Process Assistance

Software project development can be improved if assistance is provided to ensure furtherance in development. This paper reviews diierent kinds of assistance one can expect from a software development environment. Then, we propose concepts for sofware process modeling and we show how the resulting modeling can be used to achieve the diierent kinds of assistance. We relate our proposal to the fra...

متن کامل

The Development of an Integrated Modeling Environment

This paper suggests an approach of delivering a new generation of modeling tools with improved user interface without giving up the mathematical engines of currently available tools. The approach is presented through the description of an integrated environment for modeling computer systems and communication networks named IDEAS, which is currently under development at Duke University. The key ...

متن کامل

Integrating Project Management Applications as Web Services

Many related software applications can be employed at various stages of a project, at different locations and for disparate purposes. Integrating these tools can help extend the capabilities of individual software applications. This paper addresses some of the issues related to the integration of distributed software applications as Web services. Specifically, information modeling for project m...

متن کامل

The MISSION - SPM Approach for Representing and Analyzing Software Projects

The main objective of software project/process management activities is to ensure that all project deliverables will be provided before project deadlines, all resulted software products will satisfy end-user requirements and development costs will be within the estimated budget. This paper presents a unified approach for software project/process management which combines object-oriented structu...

متن کامل

An Integrated Baseline Geodatabase for Facilitating the Environmental Impact Assessment Process: Case Study of Sabalan Geothermal Project, Iran

Baseline data represent one of the important stages of Environmental Impact Assessment (EIA) procedure that describes the existing environment of the study area and surrounding areas in enough detail to allow the environmental impacts of the proposed area to be accurately and adequately assessed, and future changes and effects can be measured. Baseline data may be inaccurate, difficult to obtai...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005