This paper addresses the importance of the actions to be taken before the project planning phases begin. The approach taken stems from the production planning paradigm, with emphasis on the product, rather than on the process. It is argued that a complete part list or product breakdown structure (PBS) is the absolute prerequisite for the design of a successful work breakdown structure (WBS) for a project. This process requires the definition of the design and configuration disciplines during the engineering phase. These critical issues of concurrent engineering and product development are also emphasized in the paper. The WBS is, in turn, needed to establish a suitable organizational breakdown structure (OBS or organigram) for the project. Finally, the assembly sequence and the related assembly breakdown structure (ABS) of the end product is required before commencing the project planning phase, which provides the schedules, resource allocation, progress control, and the like for the project management. Detailed definition of the product enables the definition of the work packages within the WBS, which combined with the installation information provide the means to structure the layout for the project organization. The result of the entire process, that begins with the product definition phase and ends with the completion of the planning phase, is called the project management plan. The procedure described in the paper will be used to design the project management plan for the Large Hadron Collider (LHC), a ten-year "ordeal" commencing at the beginning of the 1995, at CERN.
منابع مشابه
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE CERN MT/95-04 (DI) LHC Note 325 ASSEMBLY AND COMMISSIONING OF THE LHC TEST STRING P. Faugeras, for the LHC String Team
The assembly of the first version of the LHC test string has now been completed and commissioned. It makes use of the prototype short straight section assembled at CERN with its quadrupole and of the first two 10 m long dipoles manufactured by industry. The LHC string will be used to study phenomena which can be observed only when the different components are assembled in a prototype LHC cell, ...
متن کاملEUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE CERN PS DIVISION CERN PS 2001-065(BD) N2 and Xe Gas Scintillation Cross-Section, Spectrum, and Lifetime Measurements from 50 MeV to 26 GeV at the CERN PS and Booster
Beam parameters in CERN’s Proton Synchrotron (PS) accelerator must be controlled (and measured) with tighter precision than ever before to meet the stringent requirements of the Large Hadron Collider (LHC) programme. A non-destructive beam profile measurement system would be a valuable diagnostic tool. To this end, we measured N2 and Xe gas scintillation absolute cross-sections and lifetimes fo...
متن کاملEUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE CERN – PS DIVISION PS/CA/Note 2000-001 ANALYSIS OF DIFFERENT OPTIONS FOR A HIGH INTENSITY PROTON DRIVER FOR NEUTRINO FACTORY
This note reports a number of different layouts for designing a high intensity proton driver. Such a machine should perform beam accumulation and bunch compression in order to achieve the performance needed for the production of neutrino in the context of a Neutrino Factory. The different approaches are described in details as well as the optics of the various lattices. Geneva, Switzerland 14 J...
متن کاملEuropean Organization for Nuclear Research Organisation Europeenne Pour La Recherche Nucleaire Cern - Ps Division
The cooling channel of the CERN reference scenario [1] for a possible neutrino factory [2] requires an approximately 200 m long lattice, which provides solenoidal magnetic fields plus longitudinal electric fields at the same time. The electric real estate field gradient along the structure shall be 2 MV/m at 44 MHz, or 4 MV/m at 88 MHz, respectively. The CERN approach incorporates the solenoids...
متن کاملOrganisation Europeenne Pour La Recherche Nucleaire European Organization for Nuclear Research
A comparison of two types of dose equivalent meters, a recombination chamber REM-2 and a tissue-equivalent proportional counter HANDI, were carried out at the CERN-EC high energy reference field facility, CERF, in October 2001. Here, the mixed high-energy radiation field in commercial flight altitudes can be simulated with dose equivalent rates up to 2 orders of magnitude higher. The total abso...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1995