A Precedence Constraint Posting Approach for the RCPSP with Time Lags and Variable Durations

نویسندگان

  • Michele Lombardi
  • Michela Milano
چکیده

Resource Constrained Project Scheduling Problem is a very important problem in project management, manufacturing and resource optimization. We focus on a variant of RCPSP with time lags and variable activity durations. The solving approach is based on Precedence Constraint Posting that adds new precedence constraints to the original project graph so that all resource conflicts are solved and a consistent assignment of start times can be computed for whatever combination of activity durations. We propose a novel method for computing resource conflicts based on the minimum flow on the resource graph and we use it in an efficient complete search strategy. We experiment the approach on instances coming from the scheduling of parallel applications on multi processor systems on chip.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Precedence Constraint Posting for the RCPSP with Uncertain, Bounded Durations

The Resource Constrained Project Scheduling Problem is an important problem in project management, manufacturing and resource optimization. We focus on a variant of RCPSP with time lags and uncertain activity durations. We adopt a Precedence Constraint Posting approach and add precedence constraints to the original project graph so that all resource conflicts are solved and a consistent assignm...

متن کامل

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

A Min-Flow Algorithm for Minimal Critical Set Detection in Resource Constrained Project Scheduling

We propose a min-flow algorithm for detecting Minimal Critical Sets (MCS) in Resource Constrained Project Scheduling Problems (RCPSP). The MCS detection is a fundamental step in the Precedence Constraint Posting method (PCP), one of the most successful approaches for the RCPSP. The proposed approach is considerably simpler compared to existing flow based MCS detection procedures and has better ...

متن کامل

An improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling

Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial,...

متن کامل

A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS

In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009