Building and Environment Forecast Models for Actual Construction Time and Cost

نویسندگان

  • R. Martin Skitmore
  • Thomas Ng
چکیده

The actual construction time and cost of construction projects may be affected by the client, project and contractual characteristics and in many cases can be very different from the contract time and cost. In this paper, details of 93 Australian construction projects are used to develop several models for actual construction time and cost prediction. A forward crossvalidation regression analysis is used for the development of the model for actual construction time forecast when client sector, contractor selection method, contractual arrangement, project type, contract period and contract sum are known. The standard deviation of the deleted residual indicates the best model for actual construction time prediction to comprise the independent variables log contract time, lump sum procurement and non-standard contractor selection. Regression models are also developed for forecasting the actual construction time and cost when client sector, contractor selection method, contractual arrangement and project type are known while contract period and contract sum are estimated. Different forms of regression analyses, including the standard regression and the crossvalidation regression, are used and the crossvalidation regression model with the smallest deleted residual sum of squares is selected. Since these models for time and cost are dependent on the contract period and contract sum being known, it is necessary to investigate the effects in situations where these have to be estimated. The results of the sensitivity analyses show that the errors in predicted actual construction time become smaller as the contract period increases. In contrast, the errors in predicted actual construction cost are virtually the same for large and small projects.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Three-phase Hybrid Times Series Modeling Framework for Improved Hospital Inventory Demand Forecast

Background and Objectives: Efficient cost management in hospitals’ pharmaceutical inventories have the potential to remarkably contribute to optimization of overall hospital expenditures. To this end, reliable forecasting models for accurate prediction of future pharmaceutical demands are instrumental. While the linear methods are frequently used for forecasting purposes chiefly due to their si...

متن کامل

Developing a Feature Extraction of Existing Structures Using an Ambient Vibration Test

The paper aims to extract the dynamic properties of existing structures without utilizing the analytical models. The ambient vibration testing could be used on any type of frame such as concrete, steel and masonry to investigate the structural vulnerability. The method could be the first stage and necessarily for the retrofit process. To achieve this aim, the ambient vibration testing can...

متن کامل

Forecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method

Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...

متن کامل

The relationship between delegated responsibilities to the HSE employees and the performance indicators in the building construction projects in urban areas

Construction projects are one of the most important economic sectors in the world. At the same time, these projects are one of the hazardous industries that cause many accidents resulting from injuries and deaths, occupational diseases, delay in time, environmental problems and other direct and indirect damages. While in many industries, the issue of health, safety and environment is meticulous...

متن کامل

The fuzzy logic in air pollution forecasting ‎model

In the paper a model to predict the concentrations of particulate matter PM10, PM2.5, SO2, NO, CO and O3 for a chosen number of hours forward is proposed. The method requires historical data for a large number of points in time, particularly weather forecast data, actual weather data and pollution data. The idea is that by matching forecast data with similar forecast data in the historical data...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006