Developing cooperation in discontinuous s/c relationships: a case study in the construction industry

نویسندگان

  • Florence CRESPIN
  • Robert SALLE
چکیده

Developing cooperation in discontinuous s/c relationships: a case study in construction industry Florence CRESPIN and Robert SALLE The aim of this paper is to identify mechanisms at play in the development of cooperation in industries characterized by a high level of purchase discontinuity. The paper concentrates on the construction industry. In the construction industry adversarial relationships between actors (customers, contractors, subcontractors, suppliers,..) are usually the rule on specific projects such as real estate projects, construction of plants,... Several factors favor this kind of opportunistic behavior: the existing purchasing procedures based on competitive tendering, the industry fragmentation, the uniqueness of construction as a product, the distinction between design and execution, and the specific role of consultants....The crisis that this industry went through in the 90s’ led to huge competition between actors which in turn led to increased opportunism. This generated negative consequences such as difficulties for the main contractor to foresee the profitability on a given project, frequent cost and schedule overruns, confrontation and claims. Faced with these problems important changes occurred in the French construction industry at the end of the 90s’. Main contractors attempted to implement new modes of relationships with customers. This paper is based on a case study. It analyzes the evolution of a relationship between a main contractor (SBP) and two subsidiaries (DRESS and CLOTH) of the same customer group over a 9 years period. During this period, the main contractor changes its offering (including more pre-sale services, consultancy and feasibility studies when defining and designing the project) and the way to involve the customer in the management of the project (similar to the way traditional industry such as the automotive manages project with suppliers). The objective is to interact with each customer as soon as a project emerges in the customer organization. This anticipative approach aims at allowing the contractor to limit (or to avoid) the scope of the call for tender (highly uncertain), to bring more value to the customer and to have a better predictability on each project profitability.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Women’s Participation in Natural Disasters and Accidents: A Case Study of Bam Earthquake, Iran

Background: Although natural disasters leave thousands of deaths and wounded, one of their most significant outcomes is empowering women as well as taking measures with special attention to women. This study aimed to analyze women’s cooperation and its affective factors in natural disasters and accidents. Materials and Methods: The study design is cross-sectional and descriptive. The stu...

متن کامل

Developing a recommender system for assigning projects to supervising engineers (Case study: Damghan construction engineering organization)

Supervising engineers are one of the most important actors in construction industry and have an important role in improving quality and increasing safety. However, assigning projects to these engineers in some cases are unjust and inefficient. Therefore, in this paper a recommender system is developed in which the competencies of engineers along with the features of the projects are considered....

متن کامل

Five-Year Epidemiological Study and Estimation of Accidents Distribution in Construction Industry Workers in Yazd City by the Year 2011 by Applying Time Series Model

Background & Aims: Occupational accidents are known as one of the most important causes of disabilities and mortality in developed and developing countries. Construction industry is one of the most high risk occupations which its hazardous are not known completely. In addition to occupational accidents, construction workers are faced many diseases factors such as asbestos, silicon, fumes and no...

متن کامل

Developing a conceptual model based upon the Latin Hypercube Sampling for integrating OHS into project risk evaluation

Abstract Project management in construction industry, in many cases, is imperfect with respect to the integration of Occupational Health and Safety (OHS) risks. This imperfection exhibits itself as complications affecting the riskiness of industrial procedures and is illustrated usually by poor awareness of OHS within project teams. Difficulties on OHS regularly came about in the construction i...

متن کامل

Content Analysis of High-Level Documents Regarding Electricity Industry: Case of Guilan Regional Electricity Company

The role of the countrychr('39')s electricity industry is so fundamental that it is impossible to continue working in various sectors of industry, agriculture and even services. The industrychr('39')s upstream documentation plays a key role in determining the direction of its movement. In this regard, the present study aimed to analyze the content of upstream documents of Guilan Regional Electr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003