A stochastic programming based analysis of the field use in a farm
نویسندگان
چکیده
In a previous report (RRR 16-2006) the Hungarian structure of the use of arable land has been analyzed. This paper is devoted to application of a similar approach to farms. The main difference is that somewhat surprisingly the underlying mathematics, i.e. the stochastic programming model, is more complicated in the case of farm level than that one on the national level. Crop rotation determines that which crops can be produced in a field. The farm want to have certain amount of productions from some crops. The aim is to determine that use of the fields, which guarantees the highest probability of the satisfaction of demand. The results are illustrated via an example. Acknowledgements: The first author’s work was supported by the Hungarian National Research Foundation under the grant number T049396. The first author was supported by the same agency under the grant number OTKA 047340.
منابع مشابه
A Two Stage Stochastic Programming Model of the Price Decision Problem in the Dual-channel Closed-loop Supply Chain
In this paper, we propose a new model for designing integrated forward/reverse logistics based on pricing policy in direct and indirect sales channel. The proposed model includes producers, disposal center, distributers and final customers. We assumed that the location of final customers is fixed. First, a deterministic mixed integer linear programming model is developed for integrated logistic...
متن کاملFeasibility study of presenting a dynamic stochastic model based on mixed integer second-order conic programming to solve optimal distribution network reconfiguration in the presence of resources and demand-side management
Nowadays, with the use of devices such as fossil distributed generation and renewable energy resources and energy storage systems that are operated at the level of distribution networks, the problem of optimal reconfiguration has faced major challenges, so any change in the power of this resources can have different results in reconfiguration. Similarly, load changes during the day can lead to ...
متن کاملStochastic Short-Term Hydro-Thermal Scheduling Based on Mixed Integer Programming with Volatile Wind Power Generation
This study addresses a stochastic structure for generation companies (GenCoʼs) that participate in hydro-thermal self-scheduling with a wind power plant on short-term scheduling for simultaneous reserve energy and energy market. In stochastic scheduling of HTSS with a wind power plant, in addition to various types of uncertainties such as energy price, spinning /non-spinning reserve prices, unc...
متن کاملStochastic Assessment of the Renewable–Based Multiple Energy System in the Presence of Thermal Energy Market and Demand Response Program
The impact of different energy storages on power systems has become more important due to the development of energy storage technologies. This paper optimizes the stochastic scheduling of a wind-based multiple energy system (MES) and evaluates the operation of the proposed system in combination with electrical and thermal demand-response programs and the three-mode CAES (TM-CAES) unit. The prop...
متن کاملA multi-product vehicle routing scheduling model with time window constraints for cross docking system under uncertainty: A fuzzy possibilistic-stochastic programming
Mathematical modeling of supply chain operations has proven to be one of the most complex tasks in the field of operations management and operations research. Despite the abundance of several modeling proposals in the literature; for vast majority of them, no effective universal application is conceived. This issue renders the proposed mathematical models inapplicable due largely to the fact th...
متن کاملA multi-stage stochastic programming for condition-based maintenance with proportional hazards model
Condition-Based Maintenance (CBM) optimization using Proportional Hazards Model (PHM) is a kind of maintenance optimization problem in which inspections of a system relevant to its failure rate depending on the age and value of covariates are performed in time intervals. The general approach for constructing a CBM based on PHM for a system is to minimize a long run average cost per unit of time...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Annals OR
دوره 219 شماره
صفحات -
تاریخ انتشار 2014