Using Simulation to Study the Impact of Imroving Lookahead Planning on the Reliability of Production Planning
نویسندگان
چکیده
The Last Planner system (LPS) is used on construction projects to improve the reliability of production planning. A significant process of the LPS is Lookahead planning where activities are broken down into the level of operations, constraints are identified, responsibilities are assigned, and assignments are made ready. The success of Lookahead planning depends on task anticipation, which is a result of activity breakdown and design of operations, and making activities ready by removing constraints. The purpose of this paper is to show through computer simulation the relationship between improving task anticipated (TA) and the reliability of weekly work planning expressed as percent plan complete (PPC). The paper presents a simulation model for the lookahead planning process starting three weeks before execution and ending in activities executed during the work week. The study findings indicate a positive correlation between TA and PPC where improving lookahead planning can increase reliable work execution.
منابع مشابه
Impact of Demand Response Technique on Hybrid Transmission expansion planning and Reactive Power planning
In this paper, a model for hybrid transmission expansion planning (TEP) and reactive power planning (RPP) considering demand response (DR) model has been presented. In this study RPP considered by TEP for its effects on lines capacity and reduction of system expansion costs. On the other hand the expansion of the transmission system is an important subject, especially dealing with the new i...
متن کاملImproving Inventory Control in Production Process using Value Stream Mapping (VSM) and Production Line Simulation using Software Arena in urban economic centers (Case Study: Iran Bushing and Bearing Company)
Value stream mapping because of being able to understand process bottlenecks, as one of the most common tools for analyzing, identifying and eliminating various losses in operational and support processes are used. On the other hand, inventory management, precise control entry and exit of goods, accurate and timely information about the inventories status and planning, reduce product maintenanc...
متن کاملDetermining production level under uncertainty using fuzzy simulation and bootstrap technique, a case study
In every production plant, it is necessary to have an estimation of production level. Sometimes there are many parameters affective in this estimation. In this paper, it tried to find an appropriate estimation of production level for an industrial factory called Barez in an uncertain environment. We have considered a part of production line, which has different production time for different kin...
متن کاملProposing a Human Resource Balanced Scorecard based on Dynamic Systems Simulation s-based
Objective: The purpose of this study is to provide a dynamic system model for modeling the growth and learning perspective of a manufacturing company. The main focus of the model is on the company's human resources management process. Methods: In this study, an approach based on dynamic simulation has been proposed to evaluate the human resource condition. In order to do that, the researchers...
متن کاملA Comparison of Job-Shop and Group Technology Using Simulation by ARENA
Production planning is performed through diverse methods according to the type of the system it is structured upon. One of the most important steps before production planning is to determine which system best fits the firm, and how the facilities should be designed. Both job-shop and group-technology systems have their own pros and cons, each of which is suitable to a specific kind of factory. ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2011