Stakeholders Analysis and Communication for Utility Relocation in Construction Projects

نویسندگان

  • Ying-Mei Cheng
  • Chi-Hsien Hou
چکیده

Construction projects often involve complex underground utility networks that need to be relocated before the construction commences. It is often difficult to recognize the key stakeholders and manage the expectations, or even prioritize resource allocation among the stakeholders during such project. Therefore, practical investigation and interviews with experts are conducted to define the 25 key stakeholders, who are then evaluated based on their significance using six attributes power, interest, influence, impact, legitimacy and urgency with tworound Delphi method. The 25 stakeholders are classified into 3 groups Intensive, Intermediate, and Standard using k-means clustering technique. During the study, common communication issues associated with utility relocation are compiled. Their significance is compared through questionnaires and their relationship to Groups Intensive, Intermediate and Standard are also analyzed. The result can provide practical references for communication and coordination during utility relocation projects. Keywords—Utility relocation, Communication, Stakeholders, Project management

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Community Participation: The Lost Link of the Rural Informal Settlements Relocation Projects, Kerman Province, Iran (Case Studies: Band-Chah-Reza Village, Chah-Dad-Khoda Village, Ghassem-Abad Village and Shahid-Karami-Shadab Village)

Although in most of the rural development plans, relocation of informal settlements is oftenconsidered as an efficient solution to increase safety of rural communities against natural and man-made disasters,such as, earthquakes, fire hazards, floods, etc. an evaluation of recent experiences in the relocation projects show thatthe relocated community is often unsatisfied with the new residential...

متن کامل

Time-geographic visualisation of stakeholder values: A case study of city relocation

Kristina Laurell Stenlund Luleå University of Technology Luleå, Sweden Successful construction projects include stakeholder management. However, it still is diffi cult to communicate stakeholders’ interest in the early planning processes of complex building projects due to different stakeholder groups and their confl icting values. The question of how city relocation processes are infl uenced b...

متن کامل

Strategic Evaluation of Sustainable Projects based on Hybrid Group Decision Analysis with Incomplete Information

– Sustainable evaluation of construction projects in strategy-focused condition is the main issue for municipalities to appropriately improve public sector services. In this respect, the group decision-making methods could help experts to select suitable sustainable projects and to schedule them regarding their ranking results. Therefore, the objective of this study is to present a hybrid group...

متن کامل

Analysis and recognition of economic and social effects of rangeland management projects (Case study: semi-arid region of Bijar city)

Background and objectives: Rangelands, as an important part of natural resources, play an essential role in improving or reducing the economic and social conditions of local communities and rural residents. After the Forest and Rangeland Nationalization Act of 1962, in the laws passed in 1969, the exploitation of rangelands was considered as a rangeland management plan for the first time. In th...

متن کامل

Reducing rework and increasing the civil projects quality, through Total Quality Management (TQM), by using the concept of building information modeling (BIM)

One of the important problems in the field of Construction Industry is ‘rework’. It affects time, costs, quality, and almost every criteria of project success. As a result of rework and ineffective use of resources and materials in the workshops, there is always a considerable loss of resources, materials, investments, and workforce-time. Designing and planning through full awareness of clients...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014