Solving the single-machine sequencing problem using integer programming

نویسندگان

  • Kenneth R. Baker
  • Brian Keller
چکیده

Various integer programming models have been proposed for sequencing problems. However, little is known about the practical value of these models. This paper reports a comparison of six different integer programming formulations of the single-machine total tardiness problem. We created a set of especially difficult test problems and attempted to solve them with each of the formulations, using CPLEX software. We found that one formulation performs much more effectively than the others. A generic integer programming approach is still not capable of solving problems with hundreds of jobs, so in that respect, it does not compete with state-of-the-art tardiness algorithms. However, the integer programming approach remains viable for problems containing as many as 40 or 50 jobs and may be the better algorithmic choice when convenience in implementation is considered.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving Single Machine Sequencing to Minimize Maximum Lateness Problem Using Mixed Integer Programming

Despite existing various integer programming for sequencing problems, there is not enoughinformation about practical values of the models. This paper considers the problem of minimizing maximumlateness with release dates and presents four different mixed integer programming (MIP) models to solve thisproblem. These models have been formulated for the classical single machine problem, namely sequ...

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints

In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...

متن کامل

Mathematical Model and Algorithm for sequencing operations in the machine building industry

In this paper, the problem of sequencing machines in the final assembly line with regard to the supply of parts has been investigated. For this reason, a basic integer linear programming model has been developed and based on this, the problem-solving algorithm is developed in accordance with the reaction-based approach based on the renewal of the sequence of operations. Also, due to the Np-hard...

متن کامل

Integrated Due Date Setting and Scheduling on a Single Machine Considering an Unexpected Unavailability

In this paper, an integrated machine scheduling withits due date setting problem has been considered. It is assumed that the machine is subject to some kind of random unavailability. Due dates should be set in an attractive and reliable manner, implying that they should be short and possible to be met. To this end, first, long due dates are penalized in the objective function. Then, for each cu...

متن کامل

A Mathematical Programming Model and Genetic Algorithm for a Multi-Product Single Machine Scheduling Problem with Rework Processes

In this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. We concern rework in the scheduling environment and propose a mixed-integer programming (MIP) model for the problem.  Based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & Industrial Engineering

دوره 59  شماره 

صفحات  -

تاریخ انتشار 2010