Assessing Improvement Opportunities and Risks of Supply Chain Transformation Projects
نویسندگان
چکیده
Planning and control systems have deeply evolved in recent years in order to cope with the needs of manufacturing firms. It is possible to identify a route of evolution that begins with the introduction of MRP systems (Orlicky, 1975) and, passing through the management of capacity and materials constraints, moves towards contemporary APS (Advanced Planning & Scheduling) and SCM (Supply Chain Management) solutions. New functions, such as ATP (Available to Promise) or CTP (Capable to Promise), are nowadays considered necessary conditions for order planning and quoting. On the other hand, the offer of planning systems has reached a high level of performance with APS, where huge sets of objectives and constraints are standardised in libraries so that manufacturing systems can be modelled in detail. APS/SCM systems represent the most relevant innovation in the world of manufacturing since the introduction of MRP systems in the Seventies (Turbide, 1998). In fact they marry the potentialities of modern processing systems with the most sophisticated heuristic / optimising / AI-based techniques developed by operations research. Although most of the benefits provided by APS/SCM systems are generally quite apparent to operations managers which have to manage complex logistics system, a fair evaluation of these benefits should be provided by APS/SCM Vendors in order to prove that the huge amount of investment connected to the acquisition, implementation and maintenance of APS/SCM is paid back. In particular, the evaluation process could be divided into two different phases: the first one concerns the quantification of the expected improvement, while the latter focuses on the risks which could turn out in lower-than-expected returns. It is worth here specifying that the term “risk” could be intended not only to address negative cases (actual benefits lower than expected) but even positive cases (actual benefits higher than expected); moreover, when evaluating the project risk, intangible benefits (and drawbacks), such as the organisational impact of the IT project, should be considered. This work describes the achievements of a research project, carried out at Politecnico di Milano, whose objective is to develop a new methodology, SNOpAck (Supply Network
منابع مشابه
Identifying Tools and Methods For Risk Identification and Assessment in Construction Supply Chain
The construction project is a business full of risk in every process due to its complexity, changes, and involvement from various stakeholders. One of the critical risks in the construction project is in the supply chain. Identifying and assessing the risk with the right tools and methods in that area will inevitably affect the success of the project. Unfortunately, the research for the tools a...
متن کاملPrioritization of Supply Chain Risks in Automotive Industry
Supply chains are constantly exposed to various risks. An incident or uncertain event, which has positive or negative effect on the objectives of a project, is called a risk. According to this identification, analysis and prioritization of risks may have a significant role in the success of the project. The purpose of risk management is to reduce the risks of non-achievement of these object...
متن کاملPrioritization of Supply Chain Risks in Automotive Industry
Supply chains are constantly exposed to various risks. An incident or uncertain event, which has positive or negative effect on the objectives of a project, is called a risk. According to this identification, analysis and prioritization of risks may have a significant role in the success of the project. The purpose of risk management is to reduce the risks of non-achievement of these object...
متن کاملApplication of SCOR Model in an Oil- producing Company
Supply Chain Operations Reference (SCOR) model is developed and maintained by the Supply Chain Council (SCC). The model is a reference model which can be utilized to map benchmark and improve the supply chain operations. SCOR model provides companies with a basic process modeling tool, an extensive benchmark database by defining a set of supply chain metrics. This paper explains the process and...
متن کامل01 Resilient Petroleum Supply Chain Network Design under Operational & Disruption Risks: A Case Study
The oil industry is one of the biggest and most effective industries in the world. Duo to complex structure of petroleum supply chains and price and demand uncertainties, supply chain design is a suitable method for improving this industry. The complexity of supply chains causes increase vulnerability to disruption. Therefore, in order to design this supply chain, attention to resiliency that e...
متن کامل01 Resilient Petroleum Supply Chain Network Design under Operational & Disruption Risks: A Case Study
The oil industry is one of the biggest and most effective industries in the world. Duo to complex structure of petroleum supply chains and price and demand uncertainties, supply chain design is a suitable method for improving this industry. The complexity of supply chains causes increase vulnerability to disruption. Therefore, in order to design this supply chain, attention to resiliency that e...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2012