Cost-Sharing Scheduling Games on Restricted Unrelated Machines

نویسندگان

  • Guy Avni
  • Tami Tamir
چکیده

We study a very general cost-sharing scheduling game. An instance consists of k jobs and m machines and an arbitrary weighted bipartite graph denoting the jobs strategies. An edge connecting a job and a machine specifies that the job may choose the machine; edge weights correspond to processing times. Each machine has an activation cost that needs to be covered by the job assigned to it. Jobs assigned to a particular machine share its cost proportionally to the load they generate. Our game generalizes singleton cost-sharing games with weighted players. We provide a complete analysis of the game with respect to equilibrium existence, computation, convergence and quality – with respect to the total cost. We study both unilateral and coordinated deviations. We show that the main factor in determining the stability of an instance and the quality of a stable assignment is the machines’ activation-cost. Games with unit-cost machines are generalized ordinal potential games, and every instance has an optimal solution which is also a pure Nash equilibrium (PNE). On the other hand, with arbitrary-cost machines, a PNE is guaranteed to exist only for very limited instances, and the price of stability is linear in the number of players. Also, the problem of deciding whether a given game instance has a PNE is NP-complete. In our analysis of coordinated deviations, we characterize instances for which a strong equilibrium exists and can be calculated efficiently, and show tight bounds for the strong price of anarchy and the price of stability.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Coordination Mechanisms, Cost-Sharing, and Approximation Algorithms for Scheduling

We reveal a connection between coordination mechanisms for unrelated machine scheduling and cost-sharing protocols. Using this connection, we interpret three coordination mechanisms from the recent literature as Shapley-value-based cost-sharing protocols, thus providing a unifying justification regarding why these mechanisms induce potential games. More importantly, this connection provides a t...

متن کامل

Solving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs

Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...

متن کامل

Solving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs

Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...

متن کامل

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization

This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Theor. Comput. Sci.

دوره 646  شماره 

صفحات  -

تاریخ انتشار 2015