A Mathematical Approach for Three Stage Flow Shop Production Schedule with Jobs in a String of Disjoint Job Block

نویسندگان

  • Deepak Gupta
  • Sameer Sharma
  • Shefali Aggarwal
  • D. Gupta
  • S. Sharma
چکیده

The aim of this paper is to introduce the concept of disjoint job blocks in n-jobs, three machines flow shop scheduling problem to minimize the total elapsed time and rental cost of the machines under a specified rental policy in which the processing time associated with probabilities including transportation time. A heuristic approach for flow shop with a computational algorithm to find optimal or near optimal solution is described. A computer program followed by a numerical illustration is given to justify the proposed algorithm.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimization of Utilization Time for Two Stage Specially Structured Flow Shop Scheduling problem with Setup Time, Job Weightage and Jobs in a String of Disjoint Job Blocks

In this paper we study specially structured two stage flow shop scheduling problem with jobs in a string of disjoint job blocks having sequence independent setup times separated from processing times each associated with their respective probabilities including job weightage. In flow shop scheduling optimization of elapsed time may not always result in optimization of utilization time. Here, th...

متن کامل

A Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production

  In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...

متن کامل

A Hybrid Approach for Fuzzy Just-In-Time Flow Shop Scheduling with Limited Buffers and Deteriorating Jobs

This paper investigates the problem of just-in-time permutation flow shop scheduling with limited buffers and linear job deterioration in an uncertain environment. The fuzzy set theory is applied to describe this situation. A novel mixed-integer nonlinear program is presented to minimize the weighted sum of fuzzy earliness and tardiness penalties. Due to the computational complexities, the prop...

متن کامل

Heuristic Approach for Specially Structured Two Stage Flow Shop Scheduling to Minimize the Rental Cost, Processing Time, Set Up Time Are Associated with Their Probabilities Including Transportation Time and Job Weightage

The present paper is an attempt to develop a new heuristic algorithm, find the optimal sequence to minimize the utilization time of the machines and hence their rental cost for two stage specially structured flow shop scheduling under specified rental policy in which processing times and set up time are associated with their respective probabilities including transportation time. Further jo...

متن کامل

On Specially Structured Two Stage Flow Shop Scheduling Problem with Setup Time Separated from Processing Time and Jobs in a String of Disjoint Job Blocks

This paper relates to two stage specially structured flow shop scheduling problem with jobs in a string of disjoint job blocks having sequence independent setup times separated from processing times each associated with their respective probabilities, where the optimization criteria is the utilization time of machines. To minimize the utilization time an algorithm is proposed and a numerical ex...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012