Delaying pigs from the normal production flow is associated with health problems and poorer performance

نویسندگان

  • Julia Adriana Calderón Díaz
  • Alessia Diana
  • Laura Ann Boyle
  • Finola C. Leonard
  • Máire McElroy
  • Shane McGettrick
  • John Moriarty
  • Edgar García Manzanilla
چکیده

BACKGROUND Delaying pigs from advancing through the production stages could have a negative impact on their health and performance. The objective of this study was to investigate the possible implications of delaying pigs from the normal production flow on pig health and performance in a farrow-to-finish commercial farm with a self-declared All-In/All-Out (AIAO) management. RESULTS Three flows of pigs were defined, flow 1 (i.e. pigs that followed the normal production flow; 8 weeks in the nursery stage, 4 weeks in the growing stage and 8 weeks in the finisher stage), flow 2 (i.e. pigs delayed 1 week from advancing to the next production stage) and flow 3 (i.e. pigs delayed >1 week from advancing to the next production stage). Flow 3 included higher proportions of pigs from first parity sows and of lighter birth weights. When the 3 flows were matched by parity and birth weight, pigs in flow 2 were 3.8 times more likely to be lame prior to slaughter compared with pigs in flow 1. Similarly, pigs in flow 3 were more likely to be lame prior to slaughter, 4.5 times more likely to present pleurisy, 3.3 times more like to present pericarditis and 4.3 times more likely to have their heart condemned at slaughter compared with pigs in flow 1. Additionally, carcasses from pigs in flow 3 were 10 kg lighter compared with carcasses from pigs in flow 1. CONCLUSION Delayed pigs were more affected by disease and were lighter at slaughter. Besides animal welfare issues, these findings could represent considerable economic loses for pig producers. In practice, delaying pigs from the normal production flow translates into higher feeding costs, increase number of days to slaughter and increased labour requirements reducing production efficiency for the pig operation. In farrow-to-finish farms an 'all-forward' policy (i.e. no pig is left behind from stage to stage and a split marketing approach is applied when sending pigs to slaughter) might be more easily adhered to.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Effect of substitute milk on growth and breeding rates of hysterectomy derived guinea pigs neonates

In this study, considering the normal ingredients in guinea pig's milk, by using cow milk, mixture of vitamins and minerals, a milk substitute was prepared and sterilized by autoclaving and filtration methods. In food analysis of produced milk, the important substances values, such as protein, fat and ash, were suitable. Milk substitute was fed to four groups of newborn's guinea pigs that were ...

متن کامل

Trichinella britovi as a risk factor for alternative pig production systems in Greece and Europe

Trichinellosis is an important zoonosis and the most common source of human infection is meat from pigs and wild boars. The European Union (EU) supports alternative pig production systems (organic and free-ranging) as sustainable farming systems. However, these systems that allow outdoor access for farm animals, may create new or reintroduce old risks to public health. During the last years, al...

متن کامل

Reservoir Performance Assessment Based on Intelligent Well Technology

The main challenge facing the oil industry is to reduce development costs while accelerating recovery with maximizing reserves. One of the key enabling technologies in this area is intelligent well completions. Intelligent well technology (IWT) is a relatively new technology that has been adopted by many operators in recent years to improve oil and gas recovery. Intelligent well completions emp...

متن کامل

A multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation

Scheduling for a two-stage production system is one of the most common problems in production management. In this production system, a number of products are produced and each product is assembled from a set of parts. The parts are produced in the first stage that is a fabrication stage and then they are assembled in the second stage that usually is an assembly stage. In this article, the first...

متن کامل

Simultaneous production planning and scheduling in a hybrid flow shop with time periods and work shifts

Simultaneous production planning and scheduling has been identified as one of the most important factors that affect the efficient implementation of planning and scheduling operations for the production systems. In this paper, simultaneous production planning and scheduling is applied in a hybrid flow shop environment, which has numerous applications in real industrial settings. In this problem...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره 3  شماره 

صفحات  -

تاریخ انتشار 2017