A Branch-and-Cut Algorithm for Scheduling the Highly-Constrained Chilean Soccer Tournament

نویسندگان

  • Thiago F. Noronha
  • Celso C. Ribeiro
  • Guillermo Durán
  • Sebastian Souyris
  • Andres Weintraub
چکیده

The qualifying phase of the Chilean soccer championship follows the structure of a compact single round robin tournament. Good schedules are of major importance for the success of the tournament, making them more balanced, profitable, and attractive. The schedules were prepared by ad hoc procedures until 2004, when a rough integer programming strategy was proposed. In this work, we improve the original integer programming formulation. We derive valid inequalities for improving the linear relaxation bound and we propose a new branchand-cut strategy for the problem. Computational results on a real-life instance illustrate the effectiveness of the approach and the improvement in solution quality.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Branch-and-cut for a real-life highly constrained soccer tournament scheduling problem

1 Department of Industrial Engineering, University of Chile, Republica 701, Santiago, Chile. 2 Department of Computer Science, Catholic University of Rio de Janeiro, Rua Marquês de São Vicente 225, Rio de Janeiro, RJ 22453-900, Brazil. 3 Department of Computer Science, Universidade Federal Fluminense, Rua Passo da Pátria 156, Niterói, RJ 24210-240, Brazil. [email protected], {tfn,celso}@inf....

متن کامل

An Exact Algorithm for the Mode Identity Project Scheduling Problem

In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...

متن کامل

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

Scheduling the Brazilian Soccer Tournament with Fairness and Broadcast Objectives

The Brazilian soccer tournament is organized every year by the Brazilian Soccer Confederation. Its major sponsor is TV Globo, the largest media group and television network in Brazil, who imposes constraints on the games to be broadcast. Scheduling the games of this tournament is a very constrained problem, with two objectives: breaks minimization (fairness) and the maximization of the revenues...

متن کامل

An Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm

In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006