Three-tank hoist scheduling problem with unbounded or zero-width processing windows
نویسندگان
چکیده
On surface treatment lines, the products are transferred in successive tanks by a hoist. Moreover, each processing time is nested between a minimal and a maximal duration. This constraint is called the processing window constraint. An interesting problem is to find the hoist moves which maximise productivity. This paper deals with the production of identical parts in a balanced three-tank line. We prove that for zero-width or unbounded processing windows, production cycles of one or two parts are optimal.
منابع مشابه
A genetic algorithm approach for a single hoist scheduling problem with time windows constraints
This study considers a cyclic scheduling of hoist movements in electroplating industry. Several jobs have to flow through a production line according to an ordered bath sequence. They firstly enter the line at a loading buffer. Then they will be soaked sequentially in a series of tanks containing specific chemical baths. Finally, they will leave the line at the unloading buffer. The processing ...
متن کاملHoist Scheduling Problem in a Real Time Context
An electroplating, or chemical treatment, line is composed of (see fig 1) : tanks containing each a chemical reagent, an input and an output buffer, hoists transporting the products from tank to tank. Therefore, a treatment results from the successive immersion of a product in several tanks. Tanks and hoists can only process one job at a time. Specific chemical constraints exist : • once a prod...
متن کاملResolution of graphs with Bounded Cycle Time for the Cyclic Hoist Scheduling Problem
We deal with the Hoist Scheduling Problem, where a hoist carrying products along a production line must be scheduled. Products are taken from a bath once finished an operation and moved to the following one. There are time windows (a minimum and a maximum values) for the time spend at each treatment. The objective is to minimise the total production time. Our contribution is the use of bounds o...
متن کاملSingle hoist cyclic scheduling with multiple tanks: a material handling solution
A hoist controlled by a computer is widely used for moving electroplates which is chemically treated in a sequence of tanks. The hoist scheduling directly a.ects the throughput of a production system. The objective of the hoist scheduling problem is to schedule the moves to maximize the throughput. This paper investigates the hoist scheduling problem, a speci2c material handling issue, in a man...
متن کاملAn Improved Hybrid Model for the Generic Hoist Scheduling Problem
The generic hoist scheduling problem is NP-hard and arises from automated manufacturing lines. In recent work using the constraint logic programming (CLP) formalism, a unified model has been developed with the problem description and solution method separated. We provide an improved model and new preprocessing stages where, as before, solutions and proof of optimality are provided by a hybrid C...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2002