Integrating New Cost Model into HMA-Based Grid Resource Scheduling

نویسندگان

  • Jun-yan Zhang
  • Fan Min
  • Guowei Yang
چکیده

Grid systems can provide a virtual framework for management and scheduling of resources across different domains. This paper proposes an HMA-base grid resource scheduling system to implement resource finding and scheduling. A new cost model is also given, considering resource finding cost and resource deciding cost beyond traditional model. In succession, the new cost model is integrated into the HMA-base grid resource scheduling system. Our experiment shows that optimal solution under traditional cost model is no longer optimal under our model.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Job Scheduling in Data Grid Environment Based on Data and Computational Resource Availability

Data Grid is an infrastructure that controls huge amount of data files, and provides intensive computational resources across geographically distributed collaboration. The heterogeneity and geographic dispersion of grid resources and applications place some complex problems such as job scheduling. Most existing scheduling algorithms in Grids only focus on one kind of Grid jobs which can be data...

متن کامل

Resource Scheduling in a Smart Grid with Renewable Energy Resources and Plug-In Vehicles by MINLP Method

This paper presents a formulation of unit commitment for thermal units integrated with wind and solar energy systems and electrical vehicles with emphasizing on Mixed Integer Nonlinear Programming (MINLP). The renewable energy resources are included in this model due to their low electricity cost and positive effect on environment. As well as, coordinated charging strategy of electrical vehicle...

متن کامل

A New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

Cost and Environmental Pollution Reduction Based on Scheduling of Power Plants and Plug-in Hybrid Electric Vehicles

There has been a global effort to reduce the amount of greenhouse gas emissions. In an electric resource scheduling, emission dispatch and load economic dispatch problems should be considered. Using renewable energy resources (RESs), especially wind and solar, can be effective in cutting back emissions associated with power system. Further, the application of electric vehicles (EV) capable of b...

متن کامل

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003