Construction Project Monitoring with Site Photographs and 4D Project Models

نویسنده

  • Miroslaw J. Skibniewski
چکیده

Early and accurate measurement of progress is crucial for the success of a project. Early detection of discrepancies and deviation from the as-planned data allow more time for project participants to identify the best solution. Monitoring the construction progress requires the Project Managers to analyze a lot of as-built data. This time-consuming process is prone to error. To overcome this problem, people have started adopting Building Information Models (BIM) for monitoring the construction progress. In this paper, we have discussed how the site photographs, which are readily available at all project sites, can be effectively used for monitoring the progress. The 4D as-planned model is prepared at the beginning of the project. Then, a 3D model is reconstructed from time-lapsed as-built photos. For any given time, the progress can be tracked by comparing the 4D model and the 3D as-built model. The progress data is extracted by superimposing the reconstructed scene over the 4D as-planned model. The reconstructed model allows the as-built photographs to be geo-registered by the 4D as-planned model. As a result of this comparison, the progress data is then visualized in an AR environment. Progress is visualized in the 4D model using a quadrangle visualization scheme. This type of approach presents a realistic understanding of the construction progress and is a very good communication tool between project participants. We have discussed both interior and exterior construction progress monitoring is this paper DOI 10.5592/otmcj.2014.3.5 Research paper

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Real-Time Building Information Modeling (BIM) Synchronization Using Radio Frequency Identification Technology and Cloud Computing System

The online observation of a construction site and processes bears significant advantage to all business sector. BIM is the combination of a 3D model of the project and a project-planning program which improves the project planning model by up to 6D (Adding Time, Cost and Material Information dimensions to the model). RFID technology is an appropriate information synchronization tool between the...

متن کامل

A Case Study of Applying Virtual Prototyping in Construction

The use of 3D computer-aided design (CAD) models to support construction project planning has been increasing in the previous year. 3D CAD models reveal more planning ideas by visually showing the construction site environment in different stages of the construction process. Using 3D CAD models together with scheduling software to prepare construction plan can identify errors in process sequenc...

متن کامل

4d Construction Planning

Linear, 2-Dimensional and now 3-Dimensional visualization are the current tools used in the construction planning area. It is time for a new dimension to be added the dimension in which Planning Engineers are more interested. The dimension is TIME, which is now appropriate to add as the 4th dimension in construction planning. Current planning processes in the construction industry are still mai...

متن کامل

Implementation of an Open and Interoperable Process to Optimise Design and Construction Phases of a Residential Building Project: a Case Study using BIM in a Public Procurement

Building Information Modelling (BIM) represents a long-term investment that could allow reduction of time and cost control by optimising design and construction processes. It also ensures greater effectiveness of control systems. The paper is focused on a public procurement case study regarding the BIM-based validation and construction optimisation of an actual residential building designed in ...

متن کامل

The Virtual Construction Site (vircon) Tools: an Industrial Evaluation

Visual 4D planning and scheduling techniques, that integrate 3D CAD models with the timing of construction activities, have proven to be more beneficial than traditional tools and are increasingly being employed on complex projects. In 4D models, project participants can effectively visualise and analyse problems regarding sequential, spatial, process conflicts and temporal aspects of construct...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015