Title of Article: Millennium Development Goals and the Impact of Registration on the Performance of Construction Subcontractors in Nigeria

ثبت نشده
چکیده

Arising from the quest to achieve sustainable built environment and the millennium development goals in developing countries, the study examined the influence of registration on the performance of subcontractors in the Nigerian construction industry. The principal objective was to find if any relationship exists between registration and the performance of subcontractors in the Nigerian construction industry. By focusing on three commercial nerve centres of the country (Lagos, Abuja and Port Harcourt), 90 main contractors were randomly selected from the study population of 880 in the register of the Federal registration Board of Nigeria. 96 subcontractors, 90 clients and 92cconsultants were also randomly selected from the population. Descriptive and inferential (Chi-square probabilities) statistical techniques were used for the analysis. The results showed that the registration had no significant effect on the overall performance of subcontractors on construction sites in Nigeria (χ = 2.07, p = 0.05). The results also indicated that majority of the main contractors (49.4%) give notification to these specialty contractors when they are needed on site. On the other hand, a paltry number of the contractors (33.3%) affirmed that it is left for the subcontractors to monitor the progress of their bidding and final selection on sites. The study concluded that for a meaningful monitoring, sincere attention should be shifted towards registration of subcontractors with the relevant professional bodies and that competitive bidding should be encouraged among the subcontractors.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Identification and Assessment of Key Political Risk Factors Influencing Corporate Performance of International Construction Companies in North- Eastern (NE), Nigeria

 International construction companies have settled in Africa and especially Nigeria, to compete for infrastructural projects, in a bid to extend their services across their borders. The trans-border extension of the services offered by these international multi-nationals exposes them to the political risk factors pertinent with the host country. In order to survive the harsh realities of the po...

متن کامل

Combating Agricultural Child Labour for National Development: Implications for the Millenium Development Goals in Nigeria

A simmering crisis in the Nigerian agriculture today involves labour and the crisis manifests itself in the degree of labour availability, labour demand and labour productivity. One of the major products of this crisis is the increased participation of children in paid, non-familiar agricultural jobs. Agriculture ranks as one of the three most dangerous work activities, along with mining and co...

متن کامل

Public Expenditure and Economic Growth in Nigeria (A Granger Causality Approach) 1983-2012

This paper examines the impact of government expenditure on the Nigerian economy for the period 1983 - 2012. The government expenditure components used as the explanatory variables in the model are: expenditures on Health, Education, Defense, Agriculture and Transportation and Communication. The Gross Domestic Product (GDP) was used as a parameter for measuring economic growth. In order to esta...

متن کامل

Attempts to Achieve Millennium Development Goals in a Rural Area of Rio de Janeiro: Deworming and Control of Schistosomiasis

Introduction: According to the World Health Organization (WHO), helminth control could contribute to achieving 7 Millennium Development Goals (MDGs). The present study evaluated the impact of deworming on the infection rate of schistosomiasis in Sumidouro, Brazil and the consequences for the MDGs. Methods: The whole population of this area was invited to ...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014