Lower Bounds for Smith's Rule in Stochastic Machine Scheduling
نویسندگان
چکیده
We consider the problem to minimize the weighted sum of completion times in nonpreemptive parallel machine scheduling. In a landmark paper from 1986, Kawaguchi and Kyan [5] showed that scheduling the jobs according to the WSPT rule –also known as Smith’s rule– has a performance guarantee of 1 2 (1 + √ 2) ≈ 1.207. They also gave an instance to show that this bound is tight. We consider the stochastic variant of this problem in which the processing times are exponentially distributed random variables. We show, somehow counterintuitively, that the performance guarantee of the WSEPT rule, the stochastic analogue of WSPT, is not better than 1.243. This constitutes the first lower bound for WSEPT in this setting, and in particular, it sheds new light on the fundamental differences between deterministic and stochastic scheduling problems.
منابع مشابه
A Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness
This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...
متن کاملAnalysis of Smith's rule in stochastic machine scheduling
In a landmark paper from 1986, Kawaguchi and Kyan show that scheduling jobs according to ratios weight over processing time –also known as Smith’s rule– has a tight performance guarantee of (1 + √ 2)/2 ≈ 1.207 for minimizing the weighted sum of completion times in parallel machine scheduling. We prove the counterintuitive result that the performance guarantee of Smith’s rule is not better than ...
متن کاملTwo-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect
This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...
متن کاملNet Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
متن کاملNet Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...