The Maximum Average Gain in a Sequence of Bernoulli Games

نویسنده

  • Wolfgang Stadje
چکیده

Your use of the JSTOR archive indicates your acceptance of JSTOR's Terms and Conditions of Use, available at . http://www.jstor.org/page/info/about/policies/terms.jsp. JSTOR's Terms and Conditions of Use provides, in part, that unless you have obtained prior permission, you may not download an entire issue of a journal or multiple copies of articles, and you may use content in the JSTOR archive only for your personal, non-commercial use.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A two-sided Bernoulli-based CUSUM control chart with autocorrelated observations

Usually, in monitoring a proportion p < /em>, the binary observations are considered independent; however, in many real cases, there is a continuous stream of autocorrelated binary observations in which a two-state Markov chain model is applied with first-order dependence. On the other hand, the Bernoulli CUSUM control chart which is not robust to autocorrelation can be applied two-sided co...

متن کامل

A comparison of Age Average of Iranian Medal Winners in Olympic and Asian Games to their Counterparts from Selected Countries

This study attempted to draw a comparison between the age average of Iranian medal winners in Olympic and Asian games and their counterparts from selected countries. The statistical population of the study included Olympic medal winners from the past 100 years and the Iranian who had won medals in 3 rounds of Asian games. The findings indicated that the age average of Iranian medal winners of 3...

متن کامل

A risk adjusted self-starting Bernoulli CUSUM control chart with dynamic probability control limits

Usually, in monitoring schemes the nominal value of the process parameter is assumed known. However, this assumption is violated owing to costly sampling and lack of data particularly in healthcare systems. On the other hand, applying a fixed control limit for the risk-adjusted Bernoulli chart causes to a variable in-control average run length performance for patient populations with dissimilar...

متن کامل

ON (A,C,B) POLICY QUEUE WITH CHANGE OVER TIMES UNDER BERNOULLI SCHEDULE VACATION INTERRUPTION

This paper analyzes a renewal input  working vacations queue with change over times and Bernoulli schedulevacation interruption under (a,c,b) policy.The service and vacation times are exponentially distributed.The server begins service if there are at least c units in the queue and the service takes place in batches with a minimum of size a and a maximum of size b (a

متن کامل

The Effect of Estimation Error on Risk-adjusted Bernoulli GEWMA Control Chart in Multistage Healthcare Processes

Background and objectives: Risk-adjusted Bernoulli control chart is one of the main tools for monitoring multistage healthcare processes to achieve higher performance and effectiveness in healthcare settings. Using parameter estimates can lead to significantly deteriorate chart performance. However, so far, the effect of estimation error on this chart in which healthcare ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • The American Mathematical Monthly

دوره 115  شماره 

صفحات  -

تاریخ انتشار 2008