Quality Criteria for Competency Assignments: Examples from a Project Management Case Study

نویسندگان

  • Tobias Ley
  • Dietrich Albert
چکیده

We present several quality criteria for skills management initiatives based on the competence-performance approach [Kor97]. The criteria help to measure reliability and validity of a skills management approach and thereby help to determine the suitability of competency assignments in an organisation. The approach is illustrated by a case study. 1 The need for Quality Criteria in Skills Management Whenever databases are being used in skills management initiatives, they usually contain assignments of competencies to people or competencies to jobs. These assignments are established through employee profiles which provide information on the competencies possessed by a certain employee, or job profiles which detail out the competency requirements of a certain job. The question arises whether these assignments reflect the “true affairs” in the organisation – a precondition for the usefulness of such assignments. In this paper, we define competencies as personal characteristics (knowledge, skills, abilities) of employees which are relatively stable across different situations (see also [LA03a]). Competencies can be described in terms of distinguishable elements of underlying capacities or potentials which allow job incumbents to act competently in certain situations [Ber00]. Employees dynamically combine these elements according to the requirements of the situation in a self-organising process [EH99]. From a psychological perspective, competencies constitute theoretical constructs which can not be directly assessed or observed. Instead, they have to be inferred from some form of observable performance. For example, whether a project manager has the ability to communicate effectively with clients, whether she is proficient in project planning, or whether she is an expert in eLearning Systems, can not be directly observed. One would have to observe her performance in several situations (or ask someone who has done so), in order to arrive at an assessment of these competencies for that particular person.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction

The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...

متن کامل

Modified Pareto archived evolution strategy for the multi-skill project scheduling problem with generalized precedence relations

In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...

متن کامل

Prioritizing Organizational Projects with Fuzzy Data Envelopment Analysis Approach (Case Study of Educational Research Plans)

The right choice of research projects is one of the most important effective ways to increase the productivity of research projects and allocate the resources appropriately. Training and education is one of the most important institutions for educating the students and prosperous people of the country. Due to the limited resources of this organization and, on the other hand, the expansion of sc...

متن کامل

students of Management & Medical Informatic Faculty of Isfahan in 1999

Introduction. Considering the improvement of the teaching quality in the higher education, this study was planned to evaluate the field training in the faculty of management and medical informatics by students. Its results will be used in planning field training of this faculty Methods. A checklist with five variables was distributed among 57 students in this survey. Data analysis (both descri...

متن کامل

Information Technology for Project Cost Management (Case study: Soufian Cement Co, Iran)

In today's competitive world, reduction of production costs has become one of the corporates priorities. Survival triangle (cost, quality and time) is the solution that helps companies focus on these three dimensions and have the ability to compete with other companies. Cost management is the first step in this way that providing solutions and advice to managers who need help to have a precise ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004