Measuring the Bunch Frequency Multiplication at Ctf3

نویسندگان

  • A. E. Dabrowski
  • S. Bettoni
  • E. Bravin
  • R. Corsini
  • S. Döbert
  • T. Lefèvre
  • A. Rabiller
  • L. Soby
  • P. K. Skowroński
  • C. P. Welsch
چکیده

The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration to test the feasibility of the proposed Compact Linear Collider (CLIC) drive beam generation scheme. Central to this scheme is the use of RF deflectors to inject bunches into a delay loop and a combiner ring, in order to transform the initial bunch frequency of 1.5 GHz from the linac to a final bunch frequency of 12 GHz. The optimization procedure relies on several steps. The active length of each ring is carefully adjusted to within less than millimeter accuracy using a wiggler magnet. The transverse optics of the machine must be set up in a way to ensure beam isochronicity. Diagnostics based on optical Streak camera and RF power measurements have been designed to measure the longitudinal behavior of the beam during the combination. This paper presents their performance and recent measurements.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Beam Dynamics for the Preliminary Phase of the New Clic Test Facility (ctf3)

In the framework of the CLIC (Compact Linear Collider) RF power source studies, the scheme of electron pulse compression and bunch frequency multiplication, using injection by RF deflectors into an isochronous ring, will be tested, at low charge, during the preliminary phase of the new CLIC Test Facility (CTF3) at CERN. In this paper, we describe the beam dynamics studies made in order to asses...

متن کامل

An Overview of the New Clic Test Facility (ctf3)

The CLIC (Compact Linear Collider) RF power source is based on a new scheme of electron pulse compression and bunch frequency multiplication, in which the drive beam time structure is obtained by the combination of electron bunch trains in isochronous rings. The next CLIC Test Facility (CTF3) at CERN will be built in order to demonstrate the technical feasibility of the scheme. It will also con...

متن کامل

Commissioning Status of the Decelerator Test Beam Line in Ctf3

The CLIC Test Facility (CTF3) at CERN was constructed by the CTF3 collaboration to study the feasibility of the concepts for a compact linear collider. The test beam line (TBL) recently added to the CTF3 machine was designed to study the CLIC decelerator beam dynamics and 12 GHz power production. The beam line consists of a FODO lattice with high precision BPM’s and quadrupoles on movers for pr...

متن کامل

Beam Dynamics Studies for a Ctf3 Proposed Injector*

A CTF3 drive beam injector for the nominal stage is proposed, which includes thermionic DC gun, three SubHarmonic Bunchers (SHBs), one prebuncher, one 6-cell travelling wave buncher and two accelerating structures. Its beam dynamics is simulated by PARMELA. It is shown that all important parameters, e.g. satellite charge, bunch length and normalized transverse emittance can be met with the desi...

متن کامل

An Injector for the CLIC Test Facility (CTF3)

The CLIC Test Facility (CTF3) is an intermediate step to demonstrate the technical feasibility of the key concepts of the new RF power source for CLIC. CTF3 will use electron beams with an energy range adjustable from 170 MeV (3.5 A) to 380 MeV (with low current). The injector is based on a thermionic gun followed by a classical bunching system embedded in a long solenoidal field. As an alterna...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010