Right-Sizing Organizations for Quality
ثبت نشده
چکیده
Adequate staff resources are essential for achieving quality environmental, health, and safety (EHS) programs. The technical challenges, internal coordination difficulties, public-relations problems, and so on are rarely insurmountable—if you have sufficient fiscal and human resources to effectively deal with the issues. Without a minimum critical mass of resources, you become consumed with day-to-day firefighting and never make progress. In the worst case, an issue can erupt into a full-blown crisis, putting the company at risk and your reputation and career on the line. Conservative risk managers, wanting to be on the “safe side,” would argue for substantial resource commitments. The demand for rising profits, one of the primary drivers in a competitive marketplace, however, calls for limiting resources to the “bare bones.” How does the strategically thinking EHS manager determine the optimal EHS resource level? What is the most efficient EHS organizational structure? How is this resource level and organization justified to senior management? This is the first in a series of three articles (to be published in successive issues of EM) that provide insight into strategies to: determine EHS needs (Part 1); organize these resources effectively (Part 2); and sell the concepts to executive management (Part 3). This material is not based on theory. The authors are senior-level EHS practitioners who have successfully dealt with management executives and boards of directors in resolving these issues and, in doing so, have mastered the techniques presented. The methods are similar to those effectively employed by other functional disciplines to define and obtain resources. Written in the context of a corporate EHS group, these techniques can be modified and adapted to any functional level within a broad range of organizations. Whether you are an individual contributor or a manager, these articles can help you to better understand resource issues.
منابع مشابه
É possível substituir processos de Engenharia de Requisitos por Contagem de Pontos de Função?
The principal problem that affects software development projects is low quality requirements specifications. Low quality requirements specifications make it difficult to develop high quality software. We propose using the Estimated Function Point Counting (EFPC) method of software size estimation as a surrogate process for Requirements Engineering (RE) process, especially for the organizations ...
متن کاملCoping with contradictions in business process re-engineering
Introduction The campaign to improve organizations operates under many banners, including total quality management, continuous improvement, right-sizing, organizational transformation, and so on. The common goal for these approaches is to change how business is conducted in order to improve organizational performance. Since 1990, few treatments of organizational change or improvement have been ...
متن کاملOptimal Locating and Sizing of Unified Power Quality Conditioner- phase Angle Control for Reactive Power Compensation in Radial Distribution Network with Wind Generation
In this article, a multi-objective planning is demonstrated for reactive power compensation in radial distribution networks with wind generation via unified power quality conditioner (UPQC). UPQC model, based on phase angle control (PAC), is used. In presented method, optimal locating of UPQC-PAC is done by simultaneous minimizing of objective functions such as: grid power loss, percentage of n...
متن کاملSizing and design decisions when virtualizing Microsoft Exchange with HP 3PAR StoreServ and ProLiant BL460c Gen8 using VMware vSphere 5
IT organizations face many sizing and design decisions when deploying and managing Microsoft® Exchange Server 2010 (Exchange 2010). Dynamic business requirements, ever-increasing mailbox capacities, and service levels have resulted in direct pressure on IT resources and budgets. These changing business requirements require new approaches to deploy, manage and maintain Exchange 2010 infrastructu...
متن کاملA New model for integrated lot sizing and scheduling in flexible job shop problem
In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and S...
متن کاملThree Metaheuristic Algorithms for Solving the Multi-item Capacitated Lot-sizing Problem with Product Returns and Remanufacturing
This paper proposes a new mixed integer programming model for multi-item capacitated lot-sizing problem with setup times, safety stock and demand shortages in closed-loop supply chains. The returned products from customers can either be disposed or be remanufactured to be sold as new ones again. Due to the complexity of problem, three meta-heuristics algorithms named simulated annealing (SA) al...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2000