On Eulerian extensions and their application to no-wait flowshop scheduling
نویسندگان
چکیده
We consider a variant of no-wait flowshop scheduling that is motivated by continuous casting in the multistage production process in steel manufacturing. The task is to find a feasible schedule with a minimum number of interruptions, i.e., continuous idle time intervals on the last production stage. Based on an interpretation as Eulerian Extension Problems, we fully settle the complexity status of any particular problem case: We give a very intuitive optimal algorithm for scheduling on two processing stages with one machine in the first stage, and we show that all other problem variants are strongly NP-hard. We also discuss alternative idle time related scheduling models and their justification in the considered steel manufacturing environment. Here, we derive constant factor approximations. The first author is supported by the Deutsche Forschungsgemeinschaft (DFG) as part of the Priority Program “Algorithm Engineering” (1307). The second author is supported by a fellowship within the Postdoc-Programme of the German Academic Exchange Service (DAAD). W. Höhn ( ) Technische Universität Berlin, Institut für Mathematik, Straße des 17. Juni 136, 10623 Berlin, Germany e-mail: [email protected] T. Jacobs National Institute of Informatics, 2-1-2 Hitotsubashi, Chiyoda-ku, Tokyo 101-8430, Japan e-mail: [email protected] N. Megow Max-Planck-Institut für Informatik, Campus E1 4, 66123 Saarbrücken, Germany e-mail: [email protected]
منابع مشابه
Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm
In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...
متن کاملَA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times
This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...
متن کاملOn Eulerian Extension Problems and their Application to Sequencing Problems
We introduce a new technique for solving several sequencing problems. We consider Gilmore and Gomory’s variant of the Traveling Salesman Problem and two variants of no-wait flowshop scheduling, the classical makespan minimization problem and a new problem arising in the multistage production process in steel manufacturing. Our technique is based on an intuitive interpretation of sequencing prob...
متن کاملSolving Re-entrant No-wait Flow Shop Scheduling Problem
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
متن کاملLot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors
This paper considers a no-wait multi product flowshop scheduling problem with sequence dependent setup times. Lot streaming divide the lots of products into portions called sublots in order to reduce the lead times and work-in-process, and increase the machine utilization rates. The objective is to minimize the makespan. To clarify the system, mathematical model of the problem is presented. Sin...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- J. Scheduling
دوره 15 شماره
صفحات -
تاریخ انتشار 2012