An Activity Scheduling Process Approach to Understanding Travel Behavior

نویسنده

  • Sean T. Doherty
چکیده

The need to understand and forecast individual travel behavior over longer periods of time and space has placed tremendous stress on available data collection and modelling techniques. Traditional travel survey methods tend to focus exclusively on observed choices, using diary and stated preference techniques. However, improving our understanding requires more than just an improved accounting of observing outcomes – rather, travel behavior researchers are increasingly recognizing the need to improve our understanding of the decision processes that underlying observed outcomes. This paper is concerned with outlining a new approach to understanding travel behavior that intrinsically recognizes that observed travel patterns are really the result of unobserved and underlying activity scheduling decision process. This approach represents an important extension of the space-time prism paradigm, and is meant to address recent policy assessment and modelling needs related to the shift towards transportation demand management. Empirical evidence gathered through the use of a new computerized household activity scheduling survey is used to describe the fundamentals of this process. In particular, evidence presented in this paper demonstrates that activity scheduling is a highly dynamic process occurring over many time horizons, with significant levels of revisions and continued pre-planning during schedule execution. This represents a significant challenge to past modelling assumptions that activities are planned simultaneously, or that they are planned and executed in the same sequence. The paper concludes with a discussion on modelling implications and future directions. Overall, this paper is meant to challenge planners, researchers and modellers to think more deeply about underlying decision processes and the assumptions inherent in their models.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Special Application of Vehicle Routing Problem with Uncertainty Travel Times: Locomotive Routing Problem

This paper aims to study the locomotive routing problem (LRP) which is one of the most important problems in railroad scheduling in view of involving expensive assets and high cost of operating locomotives. This problem is assigning a fleet of locomotives to a network of trains to provide sufficient power to pull them from their origins to destinations by satisfying a rich set of operational con...

متن کامل

Integrated Process Planning and Active Scheduling in a Supply Chain-A Learnable Architecture Approach

Through the lens of supply chain management, integrating process planning decisions and scheduling plans becomes an issue of great challenge and importance. Dealing with the problem paves the way to devising operation schedules with minimum makespan; considering the flexible process sequences, it can be viewed as a fundamental tool for achieving the scheme, too. To deal with this integration, t...

متن کامل

Social interactions in transportation: analyzing groups and spatial networks

Travel demand is derived from activities that people have to or want to engage in. Work trips have been a primary concern for transportation researchers and an early focus of transportation modeling was on commuting behavior (Ben-Akiva and Lerman 1974; Train 1980). Subsequently, non-work activities, such as shopping or doctor visits, increasingly caught the attention of transportation analysts,...

متن کامل

The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach

Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

متن کامل

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH

This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999