Discrete time-cost tradeoff model for optimizing multi-mode construction project resource allocation

نویسندگان

  • Shuangshuang Nie
  • Jihong Gao
چکیده

The project scheduling and resource allocation problems have been studied using different optimization methods. The resource leveling problem was proposed to reduce the resource fluctuation and was always studied independently resource constraint problem. For example, resource-constrained project scheduling problem (RCPSP) was proposed to optimize scheduling under resource constraints. This research proposed a new model which integrates the resource leveling problem and resource-constrained time-cost tradeoff problem. The evolutionary multi-objective optimization technique, strength Pareto evolutionary approach II (SPEA II) was applied to calculate the Pareto front of time and cost. The resource leveling measured by the metric, resource release/re-hiring, was converted to resource cost. The analysis of the time complexity of the model showed that the runtime of the algorithm was polynomial times of the number of activities. The results of case testing showed that the model was reasonably accurate in comparison with a proposed baseline model.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

A New Multi-objective Model for Multi-mode Project Planning with Risk

The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this pap...

متن کامل

Multi-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm

The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...

متن کامل

A mathematical model for the multi-mode resource investment problem

This paper presents an exact model for the resource investment problem with generalized precedence relations in which the minimum or maximum time lags between a pair of activities may vary depending on the chosen modes. All resources considered are renewable. The objective is to determine a mode and a start time for each activity so that all constraints are obeyed and the resource investment co...

متن کامل

An integrated simulation-DEA approach to multi-criteria ranking of scenarios for execution of operations in a construction project

The purpose of this study is to examine different scenarios for implementing operations in the pre-construction phase of a project, based on several competing criteria with different importance levels in order to achieve a more efficient execution plan. This paper presents a new framework that integrates discrete event simulation (DES) and data envelopment analysis (DEA) to rank different scena...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • PeerJ PrePrints

دوره 3  شماره 

صفحات  -

تاریخ انتشار 2015