An Optimal Algorithm for Closest-Pair Maintenance

نویسنده

  • Sergey Bereg
چکیده

Given a set S of n points in k-dimensional space, and an L t metric, the dynamic closest pair problem is deened as follows: nd a closest pair of S after each update of S (the insertion or the deletion of a point). For xed dimension k and xed metric L t , we give a data structure of size O(n) that maintains a closest pair of S in O(log n) time per insertion and deletion. The running time of algorithm is optimal up to constant factor because (log n) is a lower bound, in algebraic decision-tree model of computation, on the time complexity of any algorithm that maintains the closest pair (for k = 1). The algorithm is based on the fair-split tree. The constant factor in the update time is exponential in the dimension. We modify the fair-split tree to reduce it.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimizing image steganography by combining the GA and ICA

In this study, a novel approach which uses combination of steganography and cryptography for hiding information into digital images as host media is proposed. In the process, secret data is first encrypted using the mono-alphabetic substitution cipher method and then the encrypted secret data is embedded inside an image using an algorithm which combines the random patterns based on Space Fillin...

متن کامل

Designing an Optimal Stable Algorithm for Robot Swarm Motion toward a Target

In this paper, an optimal stable algorithm is presented for members of a robots swarm moving toward a target. Equations of motion of the swarm are based on Lagrangian energy equations. Regarding of similar research On the design of swarm motion algorithm, an equation of motion considered constraints to guarantee no collision between the members and the members and obstacles along the motion pat...

متن کامل

Optimizing the preventive maintenance scheduling by genetic algorithm based on cost and reliability in National Iranian Drilling Company

The present research aims at predicting the required activities for preventive maintenance in terms of equipment optimal cost and reliability. The research sample includes all offshore drilling equipment of FATH 59 Derrick Site affiliated with National Iranian Drilling Company. Regarding the method, the research uses a field methodology and in terms of its objectives, it is classified as an app...

متن کامل

Max-planck-institut @bullet@bullet Fur Informatik Enumerating the K Closest Pairs Optimally Enumerating the K Closest Pairs Optimally*

Let S be a set of n points in D-dimensional space, where D is a constant, and let k be an integer between 1 and (~). An algorithm is given that computes the k closest pairs in the set S in O(nlogn+k) time, using O(n+k) space. The . algorithm fits in the algebraic decision tree model and is, therefore, optimal.

متن کامل

An Integrated Aggregate Production Planning Model with Two-Phase Production System and Maintenance Costs

Aggregate production planning (APP) is one of the most important issues carried out in manufacturing environments which seeks efficient planning, scheduling and coordination of all production activities that optimizes the company's objectives. In this paper, we develop a mixed integer linear programming (MILP) model for an integrated aggregate production planning system with closed loop supply ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Discrete & Computational Geometry

دوره 19  شماره 

صفحات  -

تاریخ انتشار 1998