Timed Automata Approach for the Axxom Case Study Scheduling a Lacquer Production
نویسندگان
چکیده
This report presents our first experiments with the AXXOM case study proposed in AMETIST. The production plan has been entirely modeled as a network of timed automata and the scheduling problem has been therefore reduced to a minimal cost path extraction problem. The minimal cost path problem has been solved successfully for the 29 lacquers defined in the case study. Several heuristics have been applied in order to reduce the search space, while preserving the optimal solution. We found that feasible schedules (0 delay paths) exists and construct them automatically from our model.
منابع مشابه
A Case Study on Earliness/Tardiness Scheduling by Constraint Programming
The aim of this paper is to solve a problem on scheduling with earliness and tardiness costs using constraint programming approach, and to compare the results with the ones from the original timed automata approach. The case study, a production of lacquers, includes some real life features like operating hours or changeover times. Considering the earliness and tardiness costs of the case study,...
متن کاملScheduling Lacquer Production by Reachability Analysis - a Case Study 1
In this paper we describe a case study on lacquer production scheduling that was performed in the European IST-project AMETIST and was provided by one of the industrial partners. The approach is to derive schedules by means of reachability analysis: with this technique the search mechanism of model checkers, in our case here Uppaal, is used to find feasible or optimal schedules. The advantage o...
متن کاملScheduling Lacquer Production by Reachability Analysis - a Case Study
In this paper we describe a case study on lacquer production scheduling that was performed in the European IST-project AMETIST and was provided by one of the industrial partners. The approach is to derive schedules by means of reachability analysis: with this technique the search mechanism of model checkers, in our case here Uppaal, is used to find feasible or optimal schedules. The advantage o...
متن کاملScheduling Lacquer Production by Reachability Analysis - a Case
In this paper we describe a case study on lacquer production scheduling that was performed in the European IST-project AMETIST and was provided by one of the industrial partners. The approach is to derive schedules by means of reachability analysis: with this technique the search mechanism of model checkers, in our case here Uppaal, is used to find feasible or optimal schedules. The advantage o...
متن کاملProduction by Reachability Analysis - a Case Study
In this paper we describe a case study on lacquer production scheduling that was performed in the European IST-project AMETIST and was provided by one of the industrial partners. The approach is to derive schedules by means of reachability analysis: with this technique the search mechanism of model checkers, in our case here Uppaal, is used to find feasible or optimal schedules. The advantage o...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2003