Solving a mixed-integer linear programming model for a multi-skilled project scheduling problem by simulated annealing

نویسندگان

  • H. Kazemipoor
  • R. Tavakkoli-Moghaddam
  • P. Shahnazari-Shahrezaei
چکیده

Article history: Received July 20, 2011 Received in Revised form October, 12, 2011 Accepted 15 October 2011 Available online 20 October 2011 A multi-skilled project scheduling problem (MSPSP) has been generally presented to schedule a project with staff members as resources. Each activity in project network requires different skills and also staff members have different skills, too. This causes the MSPSP becomes a special type of a multi-mode resource-constrained project scheduling problem (MM-RCPSP) with a huge number of modes. Given the importance of this issue, in this paper, a mixed integer linear programming for the MSPSP is presented. Due to the complexity of the problem, a metaheuristic algorithm is proposed in order to find near optimal solutions. To validate performance of the algorithm, results are compared against exact solutions solved by the LINGO solver. The results are promising and show that optimal or near-optimal solutions are derived for small instances and good solutions for larger instances in reasonable time. © 2012 Growing Science Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The project portfolio selection and scheduling problem: mathematical model and algorithms

This paper investigates the problem of selecting and scheduling a set of projects among available projects. Each project consists of several tasks and to perform each one some resource is required. The objective is to maximize total benefit. The paper constructs a mathematical formulation in form of mixed integer linear programming model. Three effective metaheuristics in form of the imperialis...

متن کامل

A Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations

In this paper, we considered solving approaches to flexible job shop problems. Makespan is not a good evaluation criterion with overlapping in operations assumption. Accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. As overlapping in operations is a practical assumption in chemical, petrochemical, and gla...

متن کامل

Solving a mathematical model with multi warehouses and retailers in distribution network by a simulated annealing algorithm

Determination of shipment quantity and distribution problem is an important subject in today’s business. This paper describes the inventory/distribution network design. The system addresses a class of distribution network design problem, which is characterized by multiple products family, multiple warehouses and retail-ers. The maximum capacity of vehicles and warehouses are also known. The res...

متن کامل

Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition

In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...

متن کامل

Machine scheduling for multitask machining

Multitasking is an important part of today’s manufacturing plants. Multitask machine tools are capable of processing multiple operations at the same time by applying a different set of part and tool holding devices. Mill-turns are multitask machines with the ability to perform a variety of operations with considerable accuracy and agility. One critical factor in simultaneous machining is to cre...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012