Lead time anticipation in Supply Chain Operations Planning

نویسندگان

  • Michiel M. Jansen
  • Ton G. de Kok
  • Jan C. Fransoo
  • Michiel Jansen
چکیده

Linear programming (LP) models for Supply Chain Operations Planning (SCOP) are widely used in Advanced Planning Systems. The solution to the LP model is a proposal for order releases to the various production units (PU) in the supply network. As we have to account for uncertainty at the shop floor, the relationship between work-in-progress (WIP) and lead time is non-linear which makes it difficult to capture in an LP model. In this paper we propose a two-stage lead time anticipation (LTA) procedure. In the first stage the material coordination problem is solved irrespective of capacity availability using an LP. This yields a schedule of planned order releases that is input to a second stage where a heuristic procedure is applied to verify lead time feasibility of the schedule. This heuristic tracks mean and variance of the aggregate workload over the planning horizon and provides aggregate order release targets that are added to the LP formulation of the first stage which is subsequently reoptimized. The result is a smoothed schedule of planned order releases. A schedule that is lead time feasible and meets all requirements may not exist at all times. By means of discrete event simulation experiments, we compare two strategies for dealing with this situation. In the conservative strategy lead time feasibility is enforced at all times whereas in the optimistic strategy lead time feasibility is allowed to be violated if this yields a higher throughput rate. Also by means of discrete event simulation experiments, we compare the LTA procedure to an LP approach where the relation between WIP and We acknowledge two anonymous referees for their comments which helped to improve this paper considerably. Michiel Jansen School of Industrial Engineering, Eindhoven University of Technology P.O. Box 513, Paviljoen E.14 5600 MB Eindhoven, The Netherlands Tel.: +31-40-2472505 Fax: +31-40-2464531 E-mail: [email protected] Ton de Kok School of Industrial Engineering, Eindhoven University of Technology Jan Fransoo School of Industrial Engineering, Eindhoven University of Technology

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Sustainable closed-loop supply chain network design and operations planning considering human resource employment and training

Modeling and optimal solving of supply chain management problems lead to efficient decision making in strategic planning and supply chain operations, resulting in a competitive advantage. Today, with the planning of a sustainable supply chain, in addition to achieving economic goals, it is possible to meet social and environmental objectives and considerations. This research deal with sustainab...

متن کامل

A queuing-location model for in multi-product supply chain with lead time under uncertainty

Supply chain network design (SCND) problem has recently been gaining attention because an integrated management of the supply chain (SC) can reduce the unexpected/undesirable events and can affect definitely the efficiency of all the chain. A critical component of the planning activities of a manufacturing firm is the efficient design of its SC. Hence, SCND affords a sensitive platform for effi...

متن کامل

A single-vendor and a single-buyer integrated inventory model with ordering cost reduction dependent on lead time

Lead time is one of the major limits that affect planning at every stage of the supply chain system. In this paper, we study a continuous review inventory model. This paper investigates the ordering cost reductions are dependent on lead time. This study addressed two-echelon supply chain problem consisting of a single vendor and a single buyer. The main contribution of this study is that the in...

متن کامل

Integrated Inventory Model with Controllable Lead Time Involving Investment for Quality Improvement in Supply Chain System

The purpose of this article is to investigate a two-echelon supply chain inventory problem consisting of a single-vendor and a single-buyer with controllable lead time and investment for quality improvements. This paper presents an integrated vendor-buyer inventory model in order to minimize the sum of the ordering cost, holding cost, setup cost, investment for quality improvement and crashing ...

متن کامل

A seller-buyer supply chain model with exponential distribution lead time

Supply chain is an accepted way of remaining in the competition in today's rapidly changing market. This paper presents a coordinated seller-buyer supply chain model in two stages, which is called Joint Economic Lot Sizing (JELS) in literature. The delivery activities in the supply chain consist of a single raw material. We assume that the delivery lead time is stochastic and follows an exponen...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010