OpenLink: A Flexible Integration System for Environmental Risk Analysis and Management
نویسندگان
چکیده
............................................................................................................................ 1 1 BACKGROUND AND INTRODUCTION.................................................................... 1 2 OPPORTUNITIES AND GOALS.................................................................................. 2 3 TECHNOLOGY ASSESSMENT................................................................................... 5 3.1 Criteria and Issues .................................................................................................. 5 3.2 Options ................................................................................................................... 6 3.3 Proposed Solution .................................................................................................. 9 3.3.1 Layers ......................................................................................................... 9 3.3.2 Roles........................................................................................................... 11 3.3.3 New and Existing Software Development ................................................. 12 4 TECHNOLOGY DEMONSTRATIONS........................................................................ 13 4.1 Components............................................................................................................ 13 4.1.1 Models........................................................................................................ 13 4.1.2 Presentation ................................................................................................ 15 4.1.3 Data ............................................................................................................ 16 4.1.4 Network...................................................................................................... 16 4.1.5 Integration and Connections....................................................................... 17 4.2 Integration Demonstration Projects........................................................................ 17 4.2.1 Low-Level Landfill Analysis with DUST and RESRAD .......................... 18 4.2.2 MARSSIM Analysis with RESRAD ......................................................... 20 4.2.3 Nuclide Web Service.................................................................................. 24 4.3 Future .................................................................................................................... 26 5 CONCLUSIONS............................................................................................................. 28 5.1 Demonstration Assessment Versus Criteria........................................................... 28 5.2 Technology Uncertainties and Risks...................................................................... 29 5.3 Organizational Uncertainties and Risks ................................................................. 30 6 RECOMMENDATIONS ................................................................................................ 32 7 REFERENCES................................................................................................................ 35
منابع مشابه
Risk Analysis and Economic Load Dispatch Evaluation of Network with High Wind Power Penetration
This study based on investigation for integration wind power into conventional power system with its impact on fossil fuel generators and their generation management. Wind power as environmental friendly energy source can reduce the operational cost of the system due to considering no cost for energizing the generator in comparing with fossil fuel generators. However due to unpredictable nature...
متن کاملRisk Analysis of Operating Room Using the Fuzzy Bayesian Network Model
To enhance Patient’s safety, we need effective methods for risk management. This work aims to propose an integrated approach to risk management for a hospital system. To improve patient’s safety, we should develop flexible methods where different aspects of risk and type of information are taken into consideration. This paper proposes a fuzzy Bayesian network to model and analyze risk in the op...
متن کاملIntegrated Environmental Analysis using GIS for Rational Planning of Conservatory Management of Slopes Application in the Ouergha Basin (Morocco)
The objective of this work is the realization of a map spatialising proposals of management and planning of lands, with a view to their rational management within the framework of a sustainable development. It was based on a diagnosis of the natural environment that allowed the analysis and identification of constraints to the development of the watershed of Ouergha (North of MOROCCO). The meth...
متن کاملSystem Engineering Implementation Process for Super-Systems
System engineering is one of the most powerful tools for comprehensive project management and control. This tool emphasized the life cycle of the projects, manages every single activity and helps manage the main elements of the project through a set of management and engineering processes. The goal of the current study is to use a system engineering approach in design phase in order or to meet ...
متن کاملA Prioritization Model for HSE Risk Assessment Using Combined Failure Mode, Effect Analysis, and Fuzzy Inference System: A Case Study in Iranian Construction Industry
The unavailability of sufficient data and uncertainty in modeling, some techniques, and decision-making processes play a significant role in many engineering and management problems. Attain to sure solutions for a problem under accurate consideration is essential. In this paper, an application of fuzzy inference system for modeling the indeterminacy involved in the problem of HSE risk assessm...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2001