Wait!!! No Steroids for this Asthma…

نویسندگان

  • Abdelhamid Alsharif
  • Amik Sodhi
  • Luis C. Murillo
  • Arthur S. Headley
  • Dipen Kadaria
چکیده

BACKGROUND Strongyloides stercoralis (SS) is a parasite seen in certain parts of the USA and in people from other endemic areas. In these patients steroids might precipitate or exacerbate asthma. Apart from worsening of asthma, serious complications like hyperinfection syndrome and even death can occur in these patients if treated with steroids. Treatment is either ivermectin or albendazole based on severity of the disease. Clinicians have to be very careful when prescribing steroids in patients presenting with an exacerbation of asthma from areas endemic for Strongyloides stercoralis. CASE REPORT A young woman with history of asthma presented with complaints of nausea, vomiting, abdominal pain, wheezing, and dry cough. Physical examination revealed diffuse expiratory wheezing and mild diffuse abdominal pain without rebound or guarding. Laboratory results showed leukocytosis with eosinophilia. Stool studies showed Strongyloides stercoralis. Imaging revealed ground-glass opacities in the right upper and lower lobe along with an infiltrate in the lingular lobe on the left side. Bronchoscopy showed Strongyloides stercoralis. The patient was diagnosed with hyperinfection syndrome due to Strongyloides stercoralis most probably exacerbated by prednisone given for her asthma. Steroids were then discontinued and the patient was started on ivermectin. The patient improved with treatment. Repeat stool examination was negative for Strongyloides stercoralis. CONCLUSIONS Clinicians have to be very careful when prescribing steroids in patients presenting with an exacerbation of asthma who are from areas endemic for Strongyloides stercoralis and should test for it (preferably with serology test) before starting treatment.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

متن کامل

Comparing Mixed-Integer and Constraint Programming for the No-Wait Flow Shop Problem with Due Date Constraints

The impetus for this research was examining a flow shop problem in which tasks were expected to be successively carried out with no time interval (i.e., no wait time) between them. For this reason, they should be completed by specific dates or deadlines. In this regard, the efficiency of the models was evaluated based on makespan. To solve the NP-Hard problem, we developed two mathematical mode...

متن کامل

َA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times

This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...

متن کامل

Lot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors

This paper considers a no-wait multi product flowshop scheduling problem with sequence dependent setup times. Lot streaming divide the lots of products into portions called sublots in order to reduce the lead times and work-in-process, and increase the machine utilization rates. The objective is to minimize the makespan. To clarify the system, mathematical model of the problem is presented. Sin...

متن کامل

Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 16  شماره 

صفحات  -

تاریخ انتشار 2015