A reimagined discharge lounge as a way to an efficient discharge process

نویسندگان

  • Natalia Hernandez
  • Dinesh John
  • Joan Mitchell
چکیده

Faced with inherent inefficiencies built into transfer of a patient from emergency department (ED) to an inpatient bed, we determined that the timely availability of an inpatient bed was essential to improving efficiency and flow. Lack of beds early in the day was a major cause for delays and backup in the ED, which in turn placed the ED at risk for overcrowding and diversion. Review of the discharge process revealed that only 33.4% of discharges were completed prior to noon, and on average took 126 minutes from the time a discharge order was written to the time the patient actually left their inpatient bed. To achieve our goals of improving patient flow and discharge efficiency, we proposed a new project, called the "Discharge Hospitality Center (DHC)." Our previous attempt at creating a "discharge lounge" was unsuccessful. However, we learned from that endeavor which then allowed us to completely redesign the new DHC project and incorporate ongoing feedback from all stakeholders, sharing performance metrics regularly, and collectively searching for ways to overcome barriers and improve performance together. Strict eligibility criteria were created, and every patient was screened for DHC eligibility daily at our multidisciplinary discharge planning meeting. This multidisciplinary group made the final decision about eligibility for the DHC, and took responsibility for distributing the list of eligible patients to the acute care nursing floors immediately after their early morning meeting. Using the list of patients appropriate for the DHC, the acute floor nursing teams developed standard work for prioritization of DHC eligible patients for discharge, which more reliably allowed those patients to leave their inpatient beds earlier in the day. We found there was no need for dedicated staff at our DHC, as after discharge all outpatient procedures and policies applied. Our outcomes were quite favorable. Four months after the DHC project was launched, ED stays over 6 hours decreased from 24.6 to 15.8%, discharges before noon increased from 33.4 to 41.5%, and time improved from 126 down to 84 minutes from the time a discharge order was written to the time the patients actually left their inpatient bed. We reviewed all patients who went to the DHC on the subject of readmission and found two that were unavoidable (whether or not the DHC was used), and one patient nearly missed his ride home as he sat in the wrong location for transport pickup. In conclusion, a DHC can be successfully designed through integration and collaboration with stakeholders which can be a valuable tool to improve discharge efficiency and patient flow.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Extraction and Comparison of the Discharge Process in a Teaching Hospital

Background and Objectives: Patient discharge process starts from the point of the initial order of the physician order and continues to the discharge time of a patient and the release of the bed that was allocated to him/her. Lengthening the patient discharge process is regarded as a negative factor in the management of beds; this lengthy process leads to delay...

متن کامل

Investigation of Sediment Discharge Hydro-Induction for Preventing Sediment In Dams (a Review)

Hydro-induction sediment discharge technique (HSDT) aims to prevent reservoir sedimentation by withdrawing the discharge water from the reservoir bottom to suck up and discharge sediments, and by inducing vertical vortexes and undercurrents in the reservoir bay to keep sediments agitated and moving. The technique is facilitated with an innovative discharge conduit system having bottom intakes t...

متن کامل

Investigation of Sediment Discharge Hydro-Induction for Preventing Sediment In Dams (a Review)

Hydro-induction sediment discharge technique (HSDT) aims to prevent reservoir sedimentation by withdrawing the discharge water from the reservoir bottom to suck up and discharge sediments, and by inducing vertical vortexes and undercurrents in the reservoir bay to keep sediments agitated and moving. The technique is facilitated with an innovative discharge conduit system having bottom intakes t...

متن کامل

Self-Adaptive Morphological Filter for Noise Reduction of Partial Discharge Signals

Partial Discharge assessment in the insulation of high voltage equipment is one of the most popular approaches for prevention of the insulation breakdown. In the procedure of thisassessment, noise reduction of partial discharge signals to get the original PD signal for accurate evaluation is inevitable. This denoising process shall be carried out such a way that the main features of the p...

متن کامل

Experimental Investigation of Surface Roughness and Kerf Width During Machining of Blanking Die Material on Wire Electric Discharge Machine

Wire electric discharge machine (WEDM) is spark erosion in unconventional machining technique to cut hard and the conductive material with a wire as an electrode. The blanking die material SKD 11 is a high carbon and high chromium tool steel with high hardness and high wearing resistance property. This tool steel has broad application in press tools and dies making industries. In this research ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 3  شماره 

صفحات  -

تاریخ انتشار 2014