A time to sequence.

نویسنده

  • M V Olson
چکیده

My views on the Human Genome Project first appeared in Science in 1987 in the form of a one-word quotation: "Huge" (1). Eight years later, in deference to the size and complexity of the current program, I have been allotted more space. I use it here to examine the state of the project and to suggest a path forward. The basic game plan for an organized Human Genome Project in the United States was established by a National Research Council committee, chaired by Bruce Alberts (2). Indeed, I was testifying before this committee in 1987 when my assessment of the project's scale caught a Science reporter's attention. The Alberts Committee recommended an early emphasis on genetic linkage mapping and clone-based physical mapping of human DNA. In parallel, the committee recommended research on the technology of DNA sequencing, as well as pilot-scale sequencing of the genomes of model organisms. This approach was viewed as the best way to improve the reliability of DNA sequencing--and to drive down its cost--while simultaneously gathering data of immediate biological value. To a remarkable degree, the Alberts Committee read the historical and technical trends correctly. It now appears that even its estimates of time scale and cost-15 years at $200 million per year--were about right. In 1987, skeptics could still argue about basic feasibility with some force. Conversely, many of the project's proponents lacked a realistic sense of the diversity of problems that had to be solved before mammalian-scale sequencing would become practical. Even the Alberts Committee's middle-of-the-road recommendations would likely have proven to be overambitious if it were not for several unforeseen developments. Technically, the most important of these has been the emergence of the polymerase chain reaction (PCR) as a primary tool for DNA analysis. Rapid advances in computer technology have also been significant, particularly because they have allowed most of the project's dataanalysis and data-management needs to be met by the distributed efforts of small groups of programmers working in close collaboration with experimentalists. Finally, vigorous international participation in the project has materialized, a development that the Alberts Committee strongly en:

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Part-level Sequence Dependent Setup Time Reduction in CMS

This paper presents the idea of creating cells while reducing part-level sequence-dependent setup time in general cellular manufacturing systems (CMS). Setup time reduction in CMS has gained modest attention in the literature. This could be attributed to the fact that the fundamental problem in cell formation in CMS has been mainly related to material handling and machine utilization while setu...

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

Two meta-heuristic algorithms for parallel machines scheduling problem with past-sequence-dependent setup times and effects of deterioration and learning

This paper considers identical parallel machines scheduling problem with past-sequence-dependent setup times, deteriorating jobs and learning effects, in which the actual processing time of a job on each machine is given as a function of the processing times of the jobs already processed and its scheduled position on the corresponding machine. In addition, the setup time of a job on each machin...

متن کامل

Seismic Data Forecasting: A Sequence Prediction or a Sequence Recognition Task

In this paper, we have tried to predict earthquake events in a cluster of seismic data on pacific ring of fire, using multivariate adaptive regression splines (MARS). The model is employed as either a predictor for a sequence prediction task, or a binary classifier for a sequence recognition problem, which could alternatively help to predict an event. Here, we explain that sequence prediction/r...

متن کامل

GENETIC AND TABU SEARCH ALGORITHMS FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SET-UP TIMES AND DETERIORATING JOBS

 This paper introduces the effects of job deterioration and sequence dependent set- up time in a single machine scheduling problem. The considered optimization criterion is the minimization of the makespan (Cmax). For this purpose, after formulating the mathematical model, genetic and tabu search algorithms were developed for the problem. Since population diversity is a very important issue in ...

متن کامل

Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times

This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Science

دوره 270 5235  شماره 

صفحات  -

تاریخ انتشار 1995