1 An attainable set - based approach to schedule robustness analysis in continuous time

نویسندگان

  • Dmitry Ivanov
  • Alexandre Dolgui
  • Boris Sokolov
  • Frank Werner
چکیده

Schedules are executed under dynamic and uncertain environments. Even though considerable advancements have been achieved in the analysis of schedule robustness, the studies on dynamic system theory are quite rare in this domain. In this paper, we develop a new method for robustness analysis of those schedules that are formulated in continuous time in the state-space domain. The developed method is based on attainable sets. The technical development and approximation of attainable sets are presented. A robustness index is developed on the basis of the minimax regret approach, and it can be used as an additional indicator for decision-makers regarding the trade-off “performance vs. robustness”. With the presented results, it becomes possible to obtain attainable sets for interval data with no a priori information about perturbation impacts, i.e., for non-stationary perturbations. We conclude that attainable sets may be favourable to obtain estimations of schedule performance attainability and degradation. Attainable sets allow to consider perturbations and schedule performance as time functions. Perturbation functions may be set up for different uncertainty scenarios, including interval perturbations with fully unpredictable disruptions. Besides, the application of attainable sets can help in implementing a direct interconnection with the adaptation models which are widely described in control terms in order to design rescheduling algorithms in the state-space form with desired closed-loop properties.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Schedule robustness analysis with the help of attainable sets in continuous flow problem under capacity disruptions

Continuous flow scheduling problems have their place in many industries such as gas, oil, chemicals, glass and fluids production as well as production of granular goods and steel details. The disruptions in processing capacities may result in schedule performance decrease. In this paper, we develop a new method for robustness analysis of those schedules that are formulated in continuous time in...

متن کامل

An Extension of the Earned Value Management to Improve the Accuracy of Schedule Analysis Results

A project is any endeavor involving planned action, for example, developing a new product or constructing a dam. [CE1] Major factors for a project to be successful are applying performance measurement and feedback tool. One such well-known performance measurement tool to control the project execution is earned value management (EVM). EVM uses the fundamental principle that trends in the past ca...

متن کامل

Matrix ‎A‎pproach to ‎R‎obustness ‎A‎nalysis for ‎S‎trategy ‎S‎election

This study aims to discuss the use of robustness analysis in evaluation and selection the strategies of an organization based on a matrix approach. The proposed technique can overcome the weakness of the robustness analysis model related to reviewing a few future scenarios and also, make it possible to in a short time include the ideas of the decision makers who participate in the strategic pla...

متن کامل

A Unified IMC based PI/PID Controller Tuning Approach for Time Delay Processes

This paper proposes a new PI/PID controller tuning method within filtered Smith predictor (FSP) configuration in order to deal with various types of time delay processes including stable, unstable and integrating delay dominant and slow dynamic processes. The proposed PI/PID controller is designed based on the IMC principle and is tuned using a new constraint and without requiring any approxima...

متن کامل

A Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities

Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013