Data Center Scheduling, Generalized Flows, and Submodularity
نویسنده
چکیده
Inspired by problems in data center scheduling, we study the submodularity of certain scheduling problems as a function of the set of machine capacities and the corresponding implications. In particular, we • give a short proof that, as a function of the excess vector, maximum generalized flow is submodular and minimum cost generalized flow is supermodular; • extend Wolsey’s approximation guarantees for submodular covering problems to a new class of problems we call supermodular packing problems; • use these results to get tighter approximation guarantees for several data center scheduling problems.
منابع مشابه
Online Flow Scheduling with Deadline for Energy Conservation in Data Center Networks
We study the problem of flow scheduling in data center networks. Using speed scaling, our aim is to find an online scheduling algorithm that minimizes the total energy consumption of the network by determining both the transmission order and rates of the arriving flows while providing a strict flow deadline guarantee. Observing the superlinear property of link power consumption, the key challen...
متن کاملNet Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
متن کاملNet Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
متن کاملInter-Datacenter Scheduling of Large Data Flows
Inter-datacenter transfers of non-interactive but timely large flows over a private (managed) network is an important problem faced by many cloud service providers. The considered flows are non-interactive because they do not explicitly target the end users. However, most of them must be performed on a timely basis and are associated with a deadline. We propose to schedule these flows by a cent...
متن کاملGeneralized Cyclic Open Shop Scheduling and a Hybrid Algorithm
In this paper, we first introduce a generalized version of open shop scheduling (OSS), called generalized cyclic open shop scheduling (GCOSS) and then develop a hybrid method of metaheuristic to solve this problem. Open shop scheduling is concerned with processing n jobs on m machines, where each job has exactly m operations and operation i of each job has to be processed on machine i . However...