Starting the CENOBIUM Project: The cloister of Monreale (Sicily) Revealed

نویسندگان

  • C. Baracchini
  • M. Callieri
  • M. Corsini
  • M. Dellepiane
  • G. Wolf
چکیده

The paper presents the guidelines of the CENOBIUM project and the first results on the capitals of the cloister of Monreale (Sicily). The CENOBIUM project aims at demonstrating the strength of the integration of modern representation and analysis technologies in the context of the knowledge, documentation and fruition of 3D cultural heritage. The wonderful capitals of the cloister of Monreale are the case study of our project. In fact, most of the capitals represent episodes of the Holy Bible and they can be completely appreciated, studied and documented merely by integrating 2D and 3D technologies. The paper describes the different acquisition and documentation modalities adopted in the project: high resolution digital imaging, short range 3D laser scanning for the capitals, long range 3D laser scanning for the cloister, panoramic views, integration of the geometry of the capitals with the high resolution color images. Moreover, it outlines the main components of the system which will allow the user to virtually move inside the cloister, to choose a particular capital, and to analyze and study the 2D, 3D and text information related to it. By means of innovative technological solutions, all the information, at the highest level of detail and resolution, will be available locally, on a kiosk installation, and on the web.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Self-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices

Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...

متن کامل

AN EXPERIMENTAL INVESTIGATION OF THE SOUNDS OF SILENCE METAHEURISTIC FOR THE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH PRE-OPTIMIZED REPERTOIRE ON THE HARDEST MMLIB+ SET

This paper presents an experimental investigation of the Sounds of Silence (SoS) harmony search metaheuristic for the multi-mode resource-constrained project scheduling problem (MRCPSP) using a pre-optimized starting repertoire. The presented algorithm is based on the time oriented version of the SoS harmony search metaheuristic developed by Csébfalvi et al. [1] for the single-mode resource-con...

متن کامل

An Integrated Model of Project Scheduling and Material Ordering: A Hybrid Simulated Annealing and Genetic Algorithm

This study aims to deal with a more realistic combined problem of project scheduling and material ordering. The goal is to minimize the total material holding and ordering costs by determining the starting time of activities along with material ordering schedules subject to some constraints. The problem is first mathematically modelled. Then a hybrid simulated annealing and genetic algorithm is...

متن کامل

KNOWLEDGE MANAGEMENT TO INVESTIGATE THE FAILURE FACTORS IN MANAGING OF GAS AND OIL INDUSTRY TRANSMISSION LINES PROJECTS

In this study the challenges of managing the civil projects in oil and gas industry over recent years that failed were investigated. For this purpose, the relevant cases and their effectiveness were categorized by analyzing research data obtained from the questionnaire results. The results obtained from the research showed that there is a positive and significant relationship between the projec...

متن کامل

Multi-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm

The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006