Modeling Resource-Constrained Project Scheduling Problem and its Solution by Genetic Algorithm

نویسنده

  • Chunlai Chai
چکیده

Modeling Resource-Constrained Project Scheduling Problem and its Solution by Genetic AlgorithmChunlai Chai 87 Research on the E-commerce of Agricultural Products in Sichuan ProvinceMu Jiong, Lijia Xu, Qiang Huang, Chaolin Li 97 Study on Fuzzy Evaluation of Credit Risk of Corporate BondOuyang Jiazhong, Li Min 102 Exception Detection for Web Service Composition Using Improved Bayesian NetworkYao Chen, Shi Ying, Liqiang Zhang, Juebo Wu 108 High Points Recognition Method of Scraped Surface Based on Background SubtractionXiaopeng Li, Leilei Sun, Yonghong Liu 115 Structure Optimization of Ladle Bottom Based on Finite Element MethodGongfa Li, Zheng Li, Jianyi Kong, Guozhang Jiang, Liangxi Xie 120 Information Sharing in Supply Chain: A Literature ReviewYANG Zhonghua, ZHANG Ling 125 Production Procedure Optimization in Iron and Steel EnterpriseGuozhang Jiang, Enyuan He, Gongfa Li, Jianyi Kong, Liangxi Xie 131 Vehicle Routing Optimization Problem with Time-windows and its Solution by Genetic AlgorithmTinggui Chen, Guanglan Zhou 136 A Hybrid Method to Deformation Force of High-speed Cold Roll-beating FormingYang Ming-shun, Li Yan, Yuan Qi-long 146 Regularized Orthogonal Local Fisher Discriminant AnalysisShuhua Xu 154 Algorithm Research for Supply Chain Demand Prediction Taking Fresh Agricultural Product Enterprises as ExampleHe Wang 160 Optimization and Application of Support Vector Machine Based on SVM Algorithm ParametersYAN Hui-feng, WANG Wei-feng, LIU Jie 165

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

Modeling and Solution Procedure for a Preemptive Multi-Objective Multi-Mode Project Scheduling Model in Resource Investment Problems

In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...

متن کامل

A Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes

Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...

متن کامل

Detecting communities of workforces for the multi-skill resource-constrained project scheduling problem: A dandelion solution approach

This paper proposes a new mixed-integer model for the multi-skill resource-constrained project scheduling problem (MSRCPSP). The interactions between workers are represented as undirected networks. Therefore, for each required skill, an undirected network is formed which shows the relations of human resources. In this paper, community detection in networks is used to find the most compatible wo...

متن کامل

An Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem

This paper addresses the multi-mode multi-skilled resource-constrained project scheduling problem. Activities of real world projects often require more than one skill to be accomplished. Besides, in many real-world situations, the resources are multi-skilled workforces. In presence of multi-skilled resources, it is required to determine the combination of workforces assigned to each activity. H...

متن کامل

A Preemptive multimode resource constrained project scheduling model with cash flows

Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • JDIM

دوره 11  شماره 

صفحات  -

تاریخ انتشار 2013