About the Equivalence of Cut-off and Conventionally Renormalised Effective Field Theories
نویسنده
چکیده
The equivalence of cut-off and conventionally renormalised effective field theories is demonstrated for the example of very low energy effective field theory for the nucleon-nucleon interaction. 03.65.Nk, 11.10.Gh, 12.39.Fe, 13.75.Cs. Typeset using REVTEX 1
منابع مشابه
About the Equivalence of Cut-off and Renormalised Effective Field Theories
The equivalence of cut-off and renormalized effective field theories is demonstrated for the example of very low energy effective field theory for the nucleonnucleon interaction. 03.65.Nk, 11.10.Gh, 12.39.Fe, 13.75.Cs. Typeset using REVTEX 1
متن کاملIssues of Regularization and Renormalization in Effective Field Theories of NN Scattering
The equivalence of subtractively renormalized and cut-off effective field theories is demonstrated for the example of very low energy effective field theory for the nucleon-nucleon interaction. 03.65.Nk, 11.10.Gh, 12.39.Fe, 13.75.Cs. Typeset using REVTEX 1
متن کاملScalar Casimir Effect on a D-dimensional Einstein Static Universe
We compute the renormalised energy momentum tensor of a free scalar field coupled to gravity on an n+1-dimensional Einstein Static Universe (ESU), R×Sn, with arbitrary low energy effective operators (up to mass dimension n+1). A generic class of regulators is used, together with the Abel-Plana formula, leading to a manifestly regulator independent result. The general structure of the divergence...
متن کاملFUZZY SUBGROUPS AND CERTAIN EQUIVALENCE RELATIONS
In this paper, we study an equivalence relation on the set of fuzzysubgroups of an arbitrary group G and give four equivalent conditions each ofwhich characterizes this relation. We demonstrate that with this equivalencerelation each equivalence class constitutes a lattice under the ordering of fuzzy setinclusion. Moreover, we study the behavior of these equivalence classes under theaction of a...
متن کاملThe Investigation of Effective Factors in the Removal of Bentonite Jelly from the Joints of Cut-off Wall Panels
In the construction process of a plastic concrete cut-off wall, concreting is usually performed using the termie pipe method. In this method, concreting is performed from the lowest point in the excavated trench (containing the slurry) using a funnel and the pipe connected to it. The concrete poured in the funnel gradually settles in the panel through the termie pipe which is beneath the slurry...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1998