Solving a Supply-Delivery Scheduling Problem with Constraint Programming

نویسندگان

  • Katherine Giles
  • Willem Jan van Hoeve
چکیده

We describe a constraint programming approach for a supplydelivery problem in the petrochemical industry, in which barges transport liquid material from supplier locations to downstream processing plants. The problem is to design a pickup-and-delivery route for each barge such that given minimum and maximum inventory levels at each location are met for a given fleet size. This optimization problem is part of a larger planning system to determine the fleet size, negotiate pickup windows and quantities, and design operational schedules. We evaluate our model on representative supply networks provided by BP North America, and contrast our results with those obtained by a mixed-integer programming approach.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Basic Period Approach for Solving the Economic Lot and Delivery Scheduling in Flexible Flow Lines

In this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. Single supplier via a flexible flow line production system (FFL), produces several items and delivers them directly to an assembly facility. Based on basic period (BP) strategy, a new mixed zero-one nonlinear programming model has been develop...

متن کامل

A branch and bound algorithm to minimize the total weighted number of tardy jobs and delivery costs with late deliveries for a supply chain scheduling problem

In this paper, we study a supply chain scheduling problem that simultaneously considers production scheduling and product delivery.  jobs have to be scheduled on a single machine and delivered to  customers for further processing in batches. The objective is to minimize the sum of the total weighted number of tardy jobs and the delivery costs. In this paper, we present a heuristic algorithm (HA...

متن کامل

Coordinating Order Acceptance and Batch Delivery for an Integrated Supply Chain Scheduling

This paper develops Order Acceptance for an Integrated Production-Distribution Problem in which Batch Delivery is implemented. The aim of this problem is to coordinate: (1) rejecting some of the orders (2) production scheduling of the accepted orders and (3) batch delivery to maximize Total Net Profit. A Mixed Integer Programming is proposed for the problem. In addition, a hybrid meta-heuristic...

متن کامل

Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times

The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...

متن کامل

Yard crane scheduling in port container terminals using genetic algorithm

Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016