Simulation of Groundwater Fluxes during Open-pit Filling and under Steady State Pit Lake Conditions

نویسنده

  • D. B. Stone
چکیده

A critical component in determining post-mining pit water quality is knowledge of groundwater fluxes, both as the pit fills and after steady state conditions have been reached. Simulations of the filling of an open pit in Crescent Valley, Nevada, were made to generate inputs for pit lake chemistry predictions. The simulations show that the water table recovery is most rapid immediately after pumping stops, when the hydraulic gradients are steepest. The maximum lateral extent of water table drawdown occurs several years after pumping stops because water continues to be derived from storage as the pit fills. Under steady state conditions, the lake stage is lower than the elevation of the water table in the pit area prior to mining, and groundwater flow is directed toward the pit lake, because evaporation from the lake surface causes it to act as a groundwater sink.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Formation of a deep pit lake: case study of Aguas Claras, Brazil

The paper presents the case study of the current formation of a Brazilian pit lake from an iron ore mining activity. The water used for the filling of the lake comes from rain, ground water and the complementary pumpage from a close river. At its final stage, which will be reached around year 2018, Lake Aguas Claras will have a surface area of 0.67 km2 and the depth of 234 m, which will make it...

متن کامل

Application of artificial neural network and genetic algorithm to modelling the groundwater inflow to an advancing open pit mine

In this study, a hybrid intelligent model has been designed to predict groundwater inflow to a mine pit during its advance. Novel hybrid method coupling artificial neural network (ANN) with genetic algorithm (GA) called ANN-GA, was utilised. Ratios of pit depth to aquifer thickness, pit bottom radius to its top radius, inverse of pit advance time and the hydraulic head (HH) in the observation w...

متن کامل

Pit lakes as an end use of mining: A review

Theoretical review of ‘mining pit lakes’ indicates that like natural lakes such lakes display a huge diversity. They are typically in a non-equilibrium state with respect to their surroundings. Hence, at the decommissioning phase of mining operation a detailed technical study are required on different aspects of such created water bodies considering its morphometry, geology, hydrology, water qu...

متن کامل

Physical Model Test and Numerical Simulation Study of Deformation Mechanism of Wall Rock on Open Pit to Underground Mining (RESEARCH NOTE)

This paper is based on the open pit to underground mining practice of Daye Iron Mine. The influence mechanism between high-steep slope and non-pillar sublevel caving method is studied by using physical model test. Firstly, engineering geological properties of the choosing typical research section is analysed and generalized. Secondly, the system of open pit to underground mining is developing a...

متن کامل

Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2001