A Process Variant Modeling Method Comparison: Experience Report
نویسندگان
چکیده
Various process variant modeling methods have been introduced in the literature to manage process diversity in a business context. In industrial settings, it is difficult to select a method suitable for the needs and limitations of the organization due to the limited number of examples and guidelines. In this paper, we report our experiences on variant modeling in a process management consultancy company. The company experienced difficulties in maintaining and reusing process definitions of their customers and decided to evaluate variant modeling methods as a solution. We selected two methods, the Decomposition Driven and the Provop, to develop variant models of seven software project management processes from five customers. We evaluated the results together with company experts. This study contributes to the field by providing real-life examples of two variant modeling methods, a comparison of the results with these methods and a guideline for choosing a method under comparable conditions.
منابع مشابه
Experimental Study and CFD Modeling of the Ohmic Heating Process in a Static Two-Phase Biosolid – Liquid System
The effective parameters on Ohmic heating in static system containing biosolid-water were studied. The effects of distribution of particles, salinity and electric field strength on electrical conductivity,</e...
متن کاملReactor Modeling of a Non-Catalytic OCM Process
ge-newline"> One method for conversion of methane to more valuable products is by non-catalytic gas-phase oxidative coupling of methane (OCM), through which methane is converted <span style="font-size:...
متن کاملModeling and Simulation of a Divided Wall Column for 1,3 Butadiene Purification
The distillation process remains as the most common method ofseparation in chemical process industries. The energy used from this process accounts for an estimated 3% of <span style="font-size: 10pt; c...
متن کاملارزیابی گزینههای شبکه جاده جنگلی از نظر هزینه ساخت به روش چند معیاری در محیط GIS (مطالعه موردی: بخش نمخانه جنگل خیرود کنار)
One of the most important cost factors in forest management, which involves a great deal of investment costs, is road construction. So evaluating forest roads and determining the best one can decrease costs. The objective of this study was to evaluate forest roads using Multi Criteria Evaluation with respect to costs. In Multi Criteria Evaluation method such factors as slope, aspect and soil ty...
متن کاملارزیابی گزینههای شبکه جاده جنگلی از نظر هزینه ساخت به روش چند معیاری در محیط GIS (مطالعه موردی: بخش نمخانه جنگل خیرود کنار)
One of the most important cost factors in forest management, which involves a great deal of investment costs, is road construction. So evaluating forest roads and determining the best one can decrease costs. The objective of this study was to evaluate forest roads using Multi Criteria Evaluation with respect to costs. In Multi Criteria Evaluation method such factors as slope, aspect and soil ty...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2016