Selecting a defect prediction model for maintenance resource planning and software insurance
نویسندگان
چکیده
Better post-release defect prediction models could lead to better maintenance resource allocation and potentially a software insurance system. We examine a special class of software systems and analyze the ability of currently-available defect prediction models to estimate user-reported defects for this class of software, widely-used and multi-release commercial software systems. We survey currently available models and analyze their applicability to an example system. We identify the ways in which current models fall short of addressing the needs for maintenance effort planning and software insurance.
منابع مشابه
A Hybrid Grey-Game-MCDM Method for ERP Selecting Based on BSC
An enterprise resource planning (ERP) software is needed for industries and companies that want to develop in future. Many of the manufactures and companies have a problem with ERP software selection. An inappropriate selection process can affect both the implementation and the performance of the company significantly. Although several models are proposed to solve this problem many of them did n...
متن کاملMathematical Programming Approach To Allocate Local Or National Resources For Bridge Maintenance Rehabilitation & Replacement Planning (RESEARCH NOTE)
Today’s, the transportation facilities such as terminals, street, bridge, etc, represent the major investment in highway network. Every year tremendous resources should be invested to maintain these facilities. Among them, the Bridge Management System (B.M.S.) has been necessitated by large imbalance between extensive bridge repair and maintenance needs and limited available budget. So the main...
متن کاملAn economic-statistical model for production and maintenance planning under adaptive non-central chi-square control chart
Most of the inventory control models assume that quality defect never happens, which means production process is perfect. However, in real manufacturing processes, the production process starts its operation in the in-control state; but after a period of time, shifts to the out-of-control state because of occurrence of some disturbances. In this paper, in order to approach the model to real man...
متن کاملAn FIS for Early Detection of Defect Prone Modules
Early prediction of defect prone modules helps in better resource planning, test planning and reducing the cost of defect correction in later stages of software lifecycle. Early prediction models based on design and code metrics are difficult to develop because precise values of the model inputs are not available. Conventional prediction techniques require exact inputs, therefore such models ca...
متن کاملan Optimum Resource Allocation Model for Airport Passenger Terminals (RESEARCH NOTE)
According to the current Airport planning and design practices, for a given demand level there is a corresponding space requirement. While in practice, there are always trade-offs between cost and levels of service, labor and automation, equipment and fixed facilities, and expansion of existing facilities and the addition of new ones. In this research, the airport passenger Terminal Building (P...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2003