An integrated data collection and analysis framework for remote monitoring and planning of construction operations

نویسندگان

  • Reza Akhavian
  • Amir H. Behzadan
چکیده

1474-0346/$ see front matter 2012 Elsevier Ltd. A http://dx.doi.org/10.1016/j.aei.2012.04.004 ⇑ Corresponding author. Tel.: +1 407 823 2480; fax E-mail addresses: [email protected] (R. Akhav (A.H. Behzadan). Recent advances in data collection and operations analysis techniques have facilitated the process of designing, analyzing, planning, and controlling of engineering processes. Mathematical tools such as graphical models, scheduling techniques, operations research, and simulation have enabled engineers to create models that represent activities, resources, and the environment under which a project is taking place. Traditionally, most simulation paradigms use static or historical data to create computer interpretable representations of real engineering systems. The suitability of this approach for modeling construction operations, however, has always been a challenge since most construction projects are unique in nature as every project is different in design, specifications, methods, and standards. Due to the dynamic nature and complexity of most construction operations, there is a significant need for a methodology that combines the capabilities of traditional modeling of engineering systems and real time field data collection. This paper presents the requirements and applicability of a data-driven modeling framework capable of collecting and manipulating real time field data from construction equipment, creating dynamic 3D visualizations of ongoing engineering activities, and updating the contents of a discrete event simulation model representing the real engineering system. The developed framework can be adopted for use by project decision-makers for short-term project planning and control since the resulting simulation and visualization are completely based on the latest status of project entities. 2012 Elsevier Ltd. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An integrated simulation-DEA approach to multi-criteria ranking of scenarios for execution of operations in a construction project

The purpose of this study is to examine different scenarios for implementing operations in the pre-construction phase of a project, based on several competing criteria with different importance levels in order to achieve a more efficient execution plan. This paper presents a new framework that integrates discrete event simulation (DES) and data envelopment analysis (DEA) to rank different scena...

متن کامل

An Integrated Enterprise Resources Planning (ERP) Framework forFlexible Manufacturing SystemsUsing Business Intelligence (BI)Tools

Nowadays Business intelligence (BI) tools provide optimal decision making, analyzing, controlling and monitoring of operations in enterprise systems like enterprise resource planning (ERP) and mainly refer to strong decision making methods used in online analytical processing, reporting and data analysis, such as improve internal processes, analysis of resources, information needs analysis, red...

متن کامل

A Comprehensive Mathematical Model for the Design of a Dynamic Cellular Manufacturing System Integrated with Production Planning and Several Manufacturing Attributes

    Dynamic cellular manufacturing systems,   Mixed-integer non-linear programming,   Production planning, Manufacturing attributes   This paper presents a novel mixed-integer non-linear programming model for the design of a dynamic cellular manufacturing system (DCMS) based on production planning (PP) decisions and several manufacturing attributes. Such an integrated DCMS model with an extensi...

متن کامل

Monitoring the Built-up Area Transformation Using Urban Index and Normalized Difference Built-up Index Analysis

Makassar is one of the metropolitan cities located in Indonesia which recently experiences massive an increased construction because of population growth. Mapping the spatial distribution and development of the built-up region is the best method that can use as an indicator to set the urban planning policy. The purpose of this study is to identify changes in land use and density in Makassar Cit...

متن کامل

An Integrated Human Resource Planning Framework for Project-based Organizations in Oil and Gas Industry

The complexities of the oil industry, combined project-based organizations’ complexities, have led the traditional planning of HR being failed. The success of these organizations is based on integrative human resource planning. To this end, the purpose of this study was to determine the factors and components of human resource planning in oil and gas project-based organizations and providing an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Advanced Engineering Informatics

دوره 26  شماره 

صفحات  -

تاریخ انتشار 2012