Note: A Reply to "New Product Diffusion Decisions Under Supply Constraints"

نویسندگان

  • Teck-Hua Ho
  • Sergei Savin
  • Christian Terwiesch
چکیده

I our prior work on product diffusions in presence of a capacity constraint, we postulated that a firm operating in such an environment should always attempt to fulfill as much of the present demand as is possible with the capacity constraint. In other words, the firm would never have demand backlogged while accumulating inventory. In this note, we derive a sufficient condition for the optimality of such fulfillment policy.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Dilemma in two game structures for a closed-loop supply chain under the influence of government incentives

The government organizations grant incentives to promote green product consumption, improve green product quality, boost remanufacturing activities, etc. through various policies. The objective of this study is to highlight pros and cons of two incentive policies, namely (1) incentive on manufacturer’s R&D investment and (2) direct incentive to consumer based on greening level of the product on...

متن کامل

Optimal Decisions in a Dual-channel Supply Chain for the Substitute Products with the Special Orders under DisruptionRisk and Brand Consideration

In this paper, a three-echelon supply chain , including two producers, distributor and retailer who produce products in different brands have been considered. Any manufacturer, has a separate channel and the exclusive retailer offers their products, which have been prepared from the distributor (exclusive market) with discount or other manufacturer. In this paper pricing decisions on substitute...

متن کامل

A Stochastic Programming Approach for a Multi-Site Supply Chain Planning in Textile and Apparel Industry under Demand Uncertainty

In this study, a new stochastic model is proposed to deal with a multi-product, multi-period, multi-stage, multi-site production and transportation supply chain planning problem under demand uncertainty. A two-stage stochastic linear programming approach is used to maximize the expected profit. Decisions such as the production amount, the inventory level of finished and semi-finished product, t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Management Science

دوره 57  شماره 

صفحات  -

تاریخ انتشار 2011