Some results on optimal decisions in network oriented load control in signaling networks

نویسنده

  • Stefan Pettersson
چکیده

Congestion control in the signaling system number 7 is a necessity to fulfil the requirements of a telecommunication network that satisfy customers’ requirements on quality of service. Heavy network load is an important source of customer dissatisfaction as congested networks result in deteriorated quality of service. With the introduction of a Congestion Control Mechanism (CCM), that annihilates service sessions with a predicted completion time greater than the maximum allowed completion time for the session, network performance improves dramatically. Annihilation of already delayed sessions let other sessions benefit and increase the useful overall network throughput. This report discuss the importance of customer satisfaction and the relation between congestion in signaling networks and customer dissatisfaction. The advantage of using network profit as a network performance metric is also addressed in this report. Network profit and network costs are given a stringent definition with respect to customer satisfaction. An expression of the marginal cost for accepting or annihilating sessions is also given. Finally, the CCM is refined using a decision theoretic approach that bases the decision of annihilation on the average profit attached to each of the two possible actions, i.e. annihilate the session or not. The decision theoretic approach use a load dependent probability distribution for the completion time. The results in this report indicate that the decision theoretic approach to the CCM (DCCM) is robust and can handle very high overloads, both transient and focused, keeping the network profit on a high level.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal Placement and Sizing of Distributed Generations in Unbalanced Distribution Networks Considering Load Models and Uncertainties

Development of distributed generations’ technology, trends in the use of these sources to improve some of the problems such as high losses, low reliability, low power quality and high costs in distributed networks. Choose the correct location to install and proper capacity of these sources, such as important things that must be considered in their use. Since distribution networks are actu...

متن کامل

Under Frequency Load shedding Algorithm in Smart Islanded Networks Using Loads Frequency Index

This paper presents an optimal method of frequency load shedding (UFLS) based on the rate of change of frequency of load (ROCOFL) in islanded distribution networks (DN). The proposed method minimizes the average amount of penalties paid by the independent operator of the network by utilizing the relevant cost function. The function of islanded distribution network occurs after an error in the s...

متن کامل

A Customer Oriented Approach for Distribution System Reliability Improvement using Optimal Distributed Generation and Switch Placement

The reliability of distribution networks is inherently low due to their radial nature, consequently distribution companies (DisCos) usually seek to improve the system reliability indices with the minimum possible investment cost. This can be known as system-oriented reliability planning (SORP). However, there can exist some customers that are not satisfied by their reliability determined by ado...

متن کامل

A Hybrid Algorithm for Optimal Location and Sizing of Capacitors in the presence of Different Load Models in Distribution Network

In practical situations, distribution network loads are the mixtures of residential, industrial, and commercial types. This paper presents a hybrid optimization algorithm for the optimal placement of shunt capacitor banks in radial distribution networks in the presence of different voltage-dependent load models. The algorithm is based on the combination of Genetic Algorithm (GA) and Binary Part...

متن کامل

Improving the resilience of active distribution networks by optimal charging/discharging management of electric vehicles in parking lots

In the event of a severe incident with a high impact and low probability of occurrence, distribution networks may be separated from upstream networks and several feeders may be disconnected simultaneously within the distribution networks. In such circumstances, to maximize the resilience of the distribution networks and to prevent long-term global outages, they are reconfigured and islanded to ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1997