Planning for the Semiconductor Manufacturer of the Future

نویسنده

  • Hugh E. Fargher
چکیده

Introduction Texas Instruments (TI) is currently contracted bY the Air Force Wright Laboratory and the Defense Advanced Research Projects Agency (DARPA) to develop the next generation flexible semiconductor wafer fabrication system called Microelectronics Manufacturing Science & Technology (MMST). Several revolutionary concepts are being pioneered on MMST including new single-wafer rapid thermal processes, in-situ sensors, cluster equipment, and advanced Computer Integrated Manufacturing (CIM) software. The objective of the project is to develop a manufacturing system capable of achieving an order of magnitude improvement in almost all aspects of wafer fabrication [1]. TI was awarded the contract in October, 1988, and will complete development with a fabrication facility demonstration in April, 1993. An important part of MMST is development of the CIM environment responsible for coordinating all parts of the system. The CIM architecture being developed is based on a distributed object oriented framework made of several cooperating subsystems. The software subsystems include: Process Control for dynamic control of factory processes; Modular Processing System for controlling the processing equipment; Generic Equipment Model which provides an interface between processing equipment and the rest of the factory; Specification System which maintains factory documents and product specifications; Simulator for modelling the factory for analysis purposes; Scheduler for scheduling work on the factory floor; and the Planner for planning and monitoring of orders within the factory. This paper first outlines the division of responsibility between the Planner, Scheduler, and Simulator subsystems. It then describes the approach to incremental planning and the way in which uncertainty is modelled within the plan representation. Finally, current status and initial results are described.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

OPTIMAL LOT-SIZING DECISIONS WITH INTEGRATED PURCHASING, MANUFACTURING AND ASSEMBLING FOR REMANUFACTURING SYSTEMS

This work applies fuzzy sets to the integration of purchasing, manufacturing and assembling of production planning decisions with multiple suppliers, multiple components and multiple machines in remanufacturing systems. The developed fuzzy multi-objective linear programming model (FMOLP) simultaneously minimizes total costs, total $text{CO}_2$ emissions and total lead time with reference to cus...

متن کامل

Surface Dose Measurements on an Indigenously Made Inhomogeneous Female Pelvic Phantom Using Metal-Oxide-Semiconductor-Field-Effect-Transistor Based Dosimetric System

Introduction: Megavoltage X-ray beams are used to treat cervix cancer due to their skin-sparing effect. Preferably, the radiation surface doses should be negligible; however, it increases due to electron contamination produced by various field parameters. Therefore, it is essential to provide proper knowledge about the effect of different field parameters on radiation doses. This study sought t...

متن کامل

A Systematic Cycle Time Reduction Procedure for Enhancing the Competitiveness and Sustainability of a Semiconductor Manufacturer

Cycle time reduction plays an important role in improving the competitiveness and sustainability of a semiconductor manufacturer. However, in the past, cycle time reduction was usually unplanned owing to the lack of a systematic and quantitative procedure. To tackle this problem, a systematic procedure was established in this study for planning cycle time reduction actions to enhance the compet...

متن کامل

Tool capacity planning for semiconductor fabrication facilities under demand uncertainty

This research is motivated by issues faced by a large manufacturer of semiconductor devices. Semiconductor manufacturing companies allocate millions of dollars every year for new types of machine tools for their facilities. Typically these are special purpose machine tools which are made to order. The rate of change in products and technology makes it dicult for manufacturers to have a good es...

متن کامل

Modeling of Capacity Reservation and Supplier Selection Based on Option Contract

    Capacity Reservation,   Option Contract,   Supplier Selection A key issue for manufacturing firms is planning for outsourced components. In this research, we have considered a manufacturer in a Make-to-Order production environment who has to outsource a special component from a set of suppliers. One selling season is considered and the manufacturer faces uncertain demand during the selling ...

متن کامل

Considering Production Planning in the Multi-period Inventory Routing Problem with Transshipment between Retailers

Generally, the inventory routing problem occurs in a supply chain where customers consider the supplier responsible for inventory replenishment. In this situation, the supplier finds the answer to questions regarding the time and quantity of delivery to the customer as well as the sequence of customers in the routes. Considering the effect of production decisions on answering these questions, t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002