EPQ Model for Trended Demand with Rework and Random Preventive Machine Time

نویسندگان

  • Nita H. Shah
  • Dushyantkumar G. Patel
  • Digeshkumar B. Shah
چکیده

Economic production quantity (EPQ) inventory model for trended demand has been analyzed with rework facility and stochastic preventive machine time. Due to the complexity of the model, search method is proposed to determine the best optimal solution. A numerical example and sensitivity analysis are carried out to validate the proposed model. From the sensitivity analysis, it is observed that the rate of change of demand has significant impact on the optimal inventory cost. The model is very sensitive to the production and demand rate.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Producer′s Replenishment Policy for an EPQ Model with Rework and Machine Failure Taking Place in Backorder Reloading Time

This paper studies the optimal producer′s replenishment policy for an economic production quantity (EPQ) model with rework and breakdown taking place in backorder replenishing time. A recent published article has studied the lot-sizing problem on an imperfect quality EPQ model. However, another reliability factor random machine breakdown is inevitable in most real-life production systems. To de...

متن کامل

An EPQ model with a random breakdown, rework, and a discontinuous issuing policy

This study attempts to determine the optimal production run time for an economic production quantity (EPQ) model with a Poisson breakdown rate, the rework of nonconforming items, and multi-delivery of finished products. It is assumed that nonconforming items can be randomly produced and repaired through a rework process added at the end of the production process. Production equipment is subject...

متن کامل

Production Systems with Rework and Machine Failure Taking Place in Backorder Filling Time

This paper investigates the optimal refilling policy for an economic production quantity (EPQ) model with rework and breakdown taking place in backorder replenishing time. A recent published article [Chiu, Y.P., 2003. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization 35, 427-437] has studied...

متن کامل

Economic Production Quantity Model with Backordering, Rework and Machine Failure Taking Place in Stock Piling Time

This paper investigates the optimal inventory replenishment policy for an economic production quantity (EPQ) model with backordering, rework and machine breakdown taking place in stock piling time. A prior paper by Chiu has examined the lot-sizing problem on an imperfect quality EPQ model. Due to another reliability factor random machine breakdown seems to be inevitable in most real world manuf...

متن کامل

Joint Determination of the Production Lot Size and Number of Shipments for Epq Model with Rework

This paper is concerned with joint determination of the optimal lot size and optimal number of shipments for an economic production quantity (EPQ) model with the reworking of random defective items produced. The classic EPQ model assumes a continuous issuing policy for satisfying product demand and perfect quality production for all items produced. However, in a real life vendor-buyer integrate...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013