Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound

نویسندگان

  • Lucio Bianco
  • Massimiliano Caramia
چکیده

In this paper we study an extension of the classical Resource-Constrained Project Scheduling Problem (RCPSP) with minimum makespan objective by introducing a further type of precedence constraints denoted as “Feeding Precedences” (FP). This kind of problem happens in that production planning environment, like make-to-order manufacturing, when the effort associated with the execution of an activity is not univocally related to its duration percentage and the traditional finish-to-start precedence constraints or the generalized precedence relations cannot completely represent the overlapping among activities. In this context we need to introduce in the RCPSP the FP constraints. For this problem we propose a new mathematical formulation and define a lower bound based on a resource constraints Lagrangian relaxation. A computational experimentation on randomly generated instances of sizes of up to 100 activities show a better performance of this lower bound with respect to others. Moreover, for the optimally solved instances, its value is very close to the optimal one.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Exact Algorithm to Minimize the Makespan in Project Scheduling with Scarce Resources and Feeding Precedence Relations

In this paper we study an extension of the Resource-Constrained Project Scheduling Problem (RCPSP) with minimum makespan objective by introducing as precedence constraints the so called “Feeding Precedences” (FP). For the RCPSP with FP we propose a new mathematical formulation and a branch and bound algorithm exploiting the latter formulation. The exact algorithm takes advantage also of a lower...

متن کامل

Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources

Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...

متن کامل

R O M a a Branch and Bound Algorithm for the Minimum Storage-time Sequencing Problem

The minimum storage-time sequencing problem generalizes many well known problems in Combinatorial Optimization, such as the directed linear arrangement and the problem of minimizing the weighted sum of completion times, subject to precedence constraints on a single processor. In this paper we propose a new lower bound, based on a Lagrangian relaxation, which can be computed very e cently. To im...

متن کامل

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

Modified Pareto archived evolution strategy for the multi-skill project scheduling problem with generalized precedence relations

In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • 4OR

دوره 9  شماره 

صفحات  -

تاریخ انتشار 2011